Components for installing the storage shelves
Components for installing the rack rails and the node
Verita
s
™
5250 S Series Appliance
Quick Start Guide
STEP 1: INSTALL STORAGE SHELVES
1.1
1.2
1.2
Node (x1)
Node rails (x2)
Bezel (x1)
Storage shelf (x1)
Identify the front and rear ends of each rail.
The illustration above shows the front view
of the left and right side rails. The arrows
indicate the position of the pins.
Determine the location on the rack where
you want to install the node. Thread the
screws through the center hole of the
bottom rack unit (RU) and into the rails.
Place the left rail inside the rack. Extend
the rail front and back to fit into the rack.
Repeat for the right rail.
Do not
over-tighten
the screws.
Left front
Right front
Left front
Left back
1.4
1.5
Remove the ear caps. Insert one screw at
the bottom of the rails at each side of the
shelf.
Do not
over-tighten the screws. If
installing a bezel, do not replace the ear
caps. Install more storage shelves as
needed, then proceed to node installation.
With the front of the storage shelf bezel
facing you, place the bezel over the front
panel of the storage shelf. Gently press
the bezel onto the front panel of the storage
shelf. The bezel is fully seated and correctly
installed when it snaps into place on the
front panel of the storage shelf.
With two people lifting the shelf onto
the rail ledges, set the shelf on the
front ledge of the mounting rails and
push the shelf to the rear of the rack.
Cap
71.65 lbs
(32.5 kg)
71.65 lb (32.5 kg)
1.3
Bezel (x1)
Screws (x2)
Storage rails (x2)