2.0
Installation
2.1
Unpacking and Handling
Note: throughout this manual the furnace lid is referred to as a "door".
When unpacking and handling the product, always lift it by its base. Do not use the door
or any other projecting cover or component to support the equipment when moving it.
Use two or more people to carry the product where possible.
Carefully remove any packing material from inside and around the product before use.
Avoid damaging the surrounding insulation when removing packing materials.
NOTE: This product contains Refractory Ceramic Fibre (also known as
Alumino Silicate Wool - ASW). For precautions and advice on handling
this material see section 7.2.
2.2
Siting and Setting Up
Place the product on a level surface in a well ventilated area.
Site away from other sources of heat and on a non-flammable surface that is resistant
to accidental spillage or hot materials.
The surface on which the equipment is mounted should be stable and not subject to
movement or vibrations.
The height of the mounting surface is important to avoid operator strain when loading
and unloading samples.
Unless otherwise stated elsewhere in this manual, ensure that there is
at least 150
mm
of free space around the back and sides of the product. Clear space is required
above the product to dissipate heat.
5
2.0 Installation
Summary of Contents for CARBOLITE GERO VCF 12/100
Page 32: ......
Page 33: ...Notes Service Record Engineer Name Date Record of Work ...