![VERDER Carbolite Gero EVT 12/450B Installation, Operation And Maintenance Instructions Download Page 13](http://html.mh-extra.com/html/verder/carbolite-gero-evt-12-450b/carbolite-gero-evt-12-450b_installation-operation-and-maintenance-instructions_1003586013.webp)
2.3.9
Figure - View showing how to support the work tube in a vertical orientation.
2.4
Setting Up - Without a Stand
Any of the E-range vertical furnaces can be supplied without a stand for either wall
mounting (using wall bracket option) or installation in customer's test rig/mounting
frame.
It is the customer’s responsibility to carry out a risk assessment on the
siting and mounting of the furnace and to ensure that it is operated in a
safe manner, see section 2.2 for the recommended siting instructions.
The fitting of the work tube is covered in the previous section.
2.4.1
Figure - Tube furnace shown without a stand for customers own mounting as
an example.
Index to numbered items in Figure 2.4.1
1. Control Box
2. Furnace Body
13
2.0 Installation
Summary of Contents for Carbolite Gero EVT 12/450B
Page 32: ......
Page 33: ...Notes Service Record Engineer Name Date Record of Work ...