INSTALLATION MANUAL
DROP-ARM AWNING V120 - NAPOLI
13227648-190828EN
4
Subject to misprints, errors and technical modifications.
1.3 Drilling the hole for control
1. Carefully mark the extension hole where the cable or strap needs to go inside for the control.
- Cable: the hole needs to be exactly at the same height as where the cable comes out of the box.
- Strap: use the cleft in the wall support (fig. 1.4).
Drill the hole for the wall lead-through.
Before drilling, check if there are no pipes or other obstacles in the wall. Always use a shelf inside the wall
to prevent damages to the plaster.
- Lead-through for the pull-up strap: 20 mm (drill 10 mm, after that 20 mm).
- Lead-through for electrical cable: 10 mm.
1.4 Installation of the awning with inside control
1.
Hang the awning in the wall supports. See figure 1.3 for electrical control or 1.4 for strap control.
2. Cable: lead the electrical cable inside through the drill lead-through hole.
Strap: install the strap guide to the wall support with the pulley on top. Guide the strap inside
through the strap guide and the drilled lead-through hole.
band
1
2
snoer
band
1
2
snoer
fig. 1.3 Hanging a motorized awning
Cable
Strap
fig. 1.4 Hanging an awning with inside strap control