background image

 4
 

Pre-Installation

TOOLS REQUIRED

Claw 
hammer

Safety 
goggles

Pencil

Level

PVC 
adhesive

Tape 
measure

Power 
drill

1/8 in. 
drill bit

5/32 in. 
drill bit

Speed 
square

Adjustable 
square

Miter 
saw

RAILING HARDWARE KIT

AA

BB

CC

DD

EE

Part

Description

Quantity (per kit)

AA

Bottom bracket

2

BB

Top bracket

2

CC

#10 x 1 in. screw

12

DD

#10 x 2 in. screw

8

EE

Driver bit

1

STAIR RAILING KIT

GG

HH

FF

II

Part

Description

Quantity (per kit)

FF

#10 x 1 in. screw

12

GG

#10 x 2 in. screw

8

HH

Stair rail bracket

4

II

Driver bit

1

LINE BALUSTER EZ MOUNT KIT

JJ

KK

Part

Description

Quantity (per kit)

JJ

EZ Mount

40

KK

EZ Mount screws

40

STAIR BALUSTER EZ MOUNT KIT

LL

MM

Part

Description

Quantity (per kit)

LL

EZ Mount Stair adapter

40

MM

EZ Mount screws

40

NOTE:

 Hardware not shown to actual size.

Summary of Contents for SEC17 RW U8 W/MTL KD

Page 1: ...e to see our full line of products available for your home improvement needs Thank you for choosing Veranda INSTALLATION MANUAL VERANDA REGENCY RAILING WITH METAL BALUSTERS Questions problems missing...

Page 2: ...ents and bottom space requirements for rails All supporting structures must be in accordance with applicable building codes Neighborhood associations and or historic districts may regulate size type p...

Page 3: ...cture on which the manufacturer s products are installed 4 Defects in or failure arising from decking structure resulting from water caused by improper installation workmanship maintenance or repair 5...

Page 4: ...Top bracket 2 CC 10 x 1 in screw 12 DD 10 x 2 in screw 8 EE Driver bit 1 STAIR RAILING KIT GG HH FF II Part Description Quantity per kit FF 10 x 1 in screw 12 GG 10 x 2 in screw 8 HH Stair rail bracke...

Page 5: ...ly due to manufacturing processes Make sure rails and balusters are cut properly to correct length and with hole pattern centered between posts before securing NOTE For best results cut post sleeves w...

Page 6: ...rn on the rails spacing the EZ Mounts JJ no more than 4 5 in apart Fig 3 Pre drill holes with a 1 8 in bit and fasten EZ Mounts JJ to the top and bottom rails using the screws KK NOTE Delay fastening...

Page 7: ...of the bottom rail at mid point of rail length to support the rail in a level position When installing an 8 foot section install two crush blocks at 1 3 points 1 3 Installing the bottom rail Completel...

Page 8: ...Inserting balusters Insert a baluster into the first EZ Mount JJ at both ends of the bottom rail and one in the middle 6 Positioning the top rail Carefully position the top rail between the posts and...

Page 9: ...balusters and lower into place between the posts After the top rail is fully seated secure using 2 in screws DD DO NOT OVERTIGHTEN NOTE Using extended drill bits is recommended to prevent damage to th...

Page 10: ...reate a consistent angle place the bottom rail 1 over the 2 x 4 and mark the end angles for the bottom rail 1 2 Marking the angles Align the top rail 1 on top of the bottom rail 2 and mark the angle o...

Page 11: ...Secure the bottom rail to the post at both ends using the 2 in screws GG DO NOT OVERTIGHTEN NOTE Using extended drill bits is recommended to prevent damage to the rail and allow a more perpendicular d...

Page 12: ...plugs at the ends of the balusters NOTE Using extended drill bits is recommended to prevent damage to the rail and allow a more perpendicular driving angle GG 10Installing the caps Complete the instal...

Page 13: ...missing parts Before returning to the store call Veranda Customer Service 8 a m 7 p m EST Monday Friday 9 a m 6 p m EST Saturday 1 800 230 7547 HOMEDEPOT COM VERANDA Retain this manual for future use...

Reviews: