APPENDIX C - (RECEIPT FORM) 

 

Before launch 

Check 
confirmation 

Type and model of fan are in accordance with the order. 

 

The fan is undamaged. 

 

There is no foreign body inside fan and the fan is clean. 

 

The fan is reliably and solidly fixed in workplace. 

 

The fan is properly levelled 

 

Wires are properly tightened. 

 

Ambient temperature and transported medium temperature are compatible with fan nameplate 

 

Proper electrical protection is applied 

 

Grounding of fan is applied. 

 

Mains supply is compatible with fan power supply. 

 

Power supply disconnecting switch (with 3mm visible gap) is applied. 

 

Personnel using the fan read and understood the operation and montage manual. 

 

Proper inlet and outlet covers (grids) have been applied 

 

 

 

After fan launch (continuous work period minimum 30 minutes) 

 

Readings and set of vibration measurement device has been written (they are available in future) 

 

Value of current for each of phase does not exceed nominal one 

 

The vibration value is not higher than permitted. 

 

 
 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Summary of Contents for RBH

Page 1: ...V1 valid since 30 10 2019 Venture Industries Sp z o o is not responsible for any damage caused by improper use of the fan and reserves the right to modify this document without informing the user OPE...

Page 2: ...veable components The fan is equipped with moveable components impeller Contact with them may cause serious injury or death The fan must not be used if covers grids and safety measures against contact...

Page 3: ...lectrical authorization Personnel need to be familiar with reactions caused by the fan Using of fan in dismantled uncompleted state is forbidden e g without junction box cover During the works e g mai...

Page 4: ...ds the device should be installed in such a way that prevent from getting access to the device rotor from the outlet It is recommended to use accessories to minimize the vibration transmitted from to...

Page 5: ...se slightly damp delicate material It is prohibited to use detergents liquids under pressure and tools that may scratch the unit surface After fan cleaning after end of maintenance turn on the fan for...

Page 6: ...motor 3 base elements 4 cable gland 5 impeller cover 6 Impeller 7 inlet 8 base direction of air flow Base elements 3 made of painted steel Impeller 6 welded with aluminium sheet Detailed information o...

Page 7: ...tage 8 power supply frequency 9 nominal fan speed 10 motor insulation class 11 weight 12 max ambient temperature 13 max temperature of transproted medium 14 informetion of accordance with ErP Directiv...

Page 8: ...are compatible with fan nameplate Proper electrical protection is applied Grounding of fan is applied Mains supply is compatible with fan power supply Power supply disconnecting switch with 3mm visib...

Page 9: ...ge of switch or security system Failure of one of supply phases Exceeding of maximum motor speed Too low flow Failed fan start up Rubbing between fan impeller and housing or foreign body e g tool left...

Page 10: ...RBH 2019 V1 10 tel 22 751 95 50 www venture pl fax 22 751 22 59 APPENDIX E DECLARATION OF MANUFACTURER...

Page 11: ...RBH 2019 V1 tel 22 751 95 50 www venture pl fax 22 751 22 59 11...

Reviews: