M
LT
N
S1
L
L
N
EL
A
M
LT
N
L
L
N
A
SB
Sample schematic of basic two-speed fan model connection (modifications
A, B
and
D
) with a humidity sensor (
H
).
70
EL
B
A
S
1
A - Fan
B - Distribution box
EL - Lighting lamp
S1 - lighting switch
(shown schematically)
SÂ - base load mode switch
(shown schematically).
S
Â
The fan operates at speed 1 with switch
SB closed or remains off with the switch
open.
As the relative humidity on the premises
increases the fan automatically switches
to speed 2 and maintains it until humidity
drops to the pre-set level.
The fan constantly operates at speed 1.
As the relative humidity on the premises
increases the fan automatically switches to
speed 2 and maintains it until humidity
drops to the pre-set level.
You may use switch S1 which also doubles
as the light switch to manually engage
speed 2.
In this case speed 2 turn-on delay is
50 seconds. The turn-off delay following
the switch opening may range from
2 to 30 minutes.
35
VN
VN
Diagram 10
Diagram 9
Summary of Contents for KP 80
Page 1: ...Operation Manual 2012 VN VN ...
Page 16: ...16 2 1 235 215 VN 80 235 215 199 135 79 102 244 244 203 138 79 102 VN 1 80 VN VN ...
Page 17: ...17 4 3 VN 80 Ê 244 215 80 75 138 204 215 244 135 201 80 75 235 235 VN 1 80 Ê VN VN ...
Page 19: ...19 VNV 1 80 VNV 1 80 KVK 265 67 135 102 80 75 215 320 235 8 7 VN VN ...
Page 20: ...20 KV 80 KP 80 KVK 80 10 9 11 VN VN ...
Page 21: ...21 INSTALLATION EXAMPLES VN 80 VN 1 80 VN 80 Ê VN 1 80 Ê 12 13 14 15 16 VN VN ...
Page 24: ...30 29 VN 1 80 INSTALLATION PROCEDURE 24 31 32 33 34 VN VN ...
Page 25: ...VN 80 INSTALLATION PROCEDURE 35 36 25 37 VN 1 80 K INSTALLATION PROCEDURE 38 39 VN VN ...
Page 26: ...40 41 26 42 43 44 VN VN ...
Page 27: ...27 VNV 1 80 KV VNV 1 80 KVK VNV 1 80 KP INSTALLATION PROCEDURE 45 46 47 48 49 VN VN ...
Page 28: ...28 PROTECTIVE FIBERBOARD PLATE 50 51 52 53 54 55 VN VN ...
Page 29: ...29 60 61 62 5 2 0 64 ELECTRICAL MAINS CONNECTION 63 1 2 VN VN ...