www.ventilation-system.com
12
VENTILATION HOOD MOUNTING
TwinFresh Solar SA-60
TwinFresh Solar SA-60-M
TwinFresh Solar SA-60-L
TwinFresh Solar SA-60 Pro
TwinFresh Solar SA-60-2
TwinFresh Solar SA-60-2 Pro
1.
Mark the fastening holes for the outer ventilation hood and drill 40 mm (19/16’’) deep holes for the 6x40 dowel.
A
B
Ø6 мм (1/4’’)
4 holes
A, [mm (inch)]
B, [mm (inch)]
A, [mm (inch)]
B, [mm (inch)]
200 (7
7
/
8
’’)
220 (8
11
/
16
”)
200 (7
7
/
8
’’)
260 (10
1
/
4
’’)
2. Insert the 6x40 dowels from the delivery set in the holes.
3. Disassemble the outer ventilation hood.
Take off the front part of the outer ventilation hood.
Remove the 4 screws and take off the front part of the outer
ventilation hood.
4.
Fix the back part of the ventilation hood on the wall with the 4x40 screws from the delivery set.
The telescope can be inserted into the ventilation hood for
maximum 110 mm (4 5/16”).
5.
Assemble the outer ventilation hood in the reverse order.
Summary of Contents for twinfresh solar SA-60
Page 27: ...V62 3 SOLAR_SA 60 EN 02 ...