
ME150 - Installation and Operation Manual
19
A
INSULATED WALL RADIATION SHIELD
B
GYPSUM BOARD
C
INSULATED WALL
3.7
Chimney Support Installation
Universal Roof Support
This support has three possible uses:
1.
It must be used on a roof to support the chimney.
2.
It may be used on a floor, ceiling or roof above an offset to support the chimney above the offset.
3.
It may be used on a floor, ceiling or roof as a supplementary support.
For roof support installation, refer to the instructions provided with the support by Olympia Chimney who
provide the maximum height of chimney that can be supported by the support. Make sure you respect
those parameters.
Universal Offset Support
This support is used to support the chimney above an offset. When the chimney offset is used to pass
through a wall, this support may be used on the wall to support the chimney. For offset support installation,
refer to the instructions provided with the support by Olympia Chimney who provide the maximum height
of chimney that can be supported by the support. Make sure you respect those parameters.
Summary of Contents for ME150
Page 5: ...ME150 Installation and Operation Manual 5 1 2 Views with measurements ...
Page 9: ...ME150 Installation and Operation Manual 9 ...
Page 15: ...ME150 Installation and Operation Manual 15 Direct installation Exterior offset installation ...
Page 24: ...24 ME150 Installation and Operation Manual ...
Page 28: ...28 ME150 Installation and Operation Manual PL60004 ...
Page 30: ...30 ME150 Installation and Operation Manual 7 1 Exploded view for replacement parts ...