Vent-Axia JUPITER315 Installation And Wiring Instructions Download Page 5

a

iroon

centre

.

co.uk

The Award Winning Ventilation Specialists

For expert advice please speak to a specialist on

0800 8

6

5 45

67

or

0121 250 2186

Mon-Fri: 8:30am - 6:30pm  |  Sat & Sun: 11am - 5pm

5

INSPECTION

These fans require maintenance; therefore allow reasonable access for these operations to be 

carried out by a suitably qualified person safely. 

ISOLATE FROM POWER SUPPLY AND ENSURE POWER CANNOT BE RE-CONNECTED BEFORE 

ANY WORK IS CARRIED OUT.

It is recommended that the fan be inspected after three months or sooner if conditions dictate. If a 

build up of dirt/deposits is evident then this should be carefully cleaned off. Please take care not to 

damage the fan or affect the balance of the impeller motor assembly (balance weights may be fitted 

to the impeller). 

Further inspections should be carried out periodically as necessary dependant on experience and site 

conditions. It is recommended that a minimum of two inspections per year be carried out 

.

The fan motors are fitted with ‘sealed for life’ bearings and, under normal circumstances, should not 

require maintenance. 

INSTRUCTIONS TO BE LEFT WITH END USER

Head Office: Fleming Way, Crawley, West Sussex, RH10 9YX. Tel: 01293 526062 Fax: 01293 551188 

UK NATIONAL CALL CENTRE

, Newton Road, Crawley, West Sussex, RH10 9JA

SALES ENQUIRIES:    

Tel: 0844 8560590   Fax: 01293 565169

TECHNICAL SUPPORT: 

Tel: 0844 8560594   Fax: 01293 539209 

For details of the warranty and returns procedure please refer to www.vent-axia.com or write to Vent-Axia Ltd, Fleming Way, Crawley, RH10 9YX 

442056A 

           0709 

Reviews: