Warnings & Safety Information 

 

Integra Plus ECA MVHR Installation & Commissioning 

3

 

 

IMPORTANT SAFETY INFORMATION 

 

PLEASE READ THESE 
INSTRUCTIONS CAREFULLY 
BEFORE COMMENCING 
INSTALLATION. 

1. Do not install this product in areas where 
the following may be present or occur: 

•  Excessive oil or a grease laden 
atmosphere. 

•  Corrosive or flammable gases, liquids or 
vapours. 

•  Subject to direct water spray from hoses. 
•  Ambient temperatures higher than 40

°

and lower than -20

°

C. 

•  Possible obstructions that may hinder 
access to or removal of the unit. 

2. All wiring must be in accordance with the 
current IEE wiring regulations BS7671, or 
appropriate standards of your country. 
Installation should be inspected and tested 
by a suitably qualified person after 
completion. 

3. Ensure the mains supply (voltage, 
frequency and phase) complies with the 
rating label. 

4. The power feed to the unit should be 
provided with a local double pole fused spur 
fitted with a 3A fuse having a contact 
separation of at least 3mm. 

Depending on the installation, if LS1 and/or 
LS2 are used they should also have 
isolating switch of similar specification to the 
main power feed installed. 

5. This unit must be earthed. 

6. Precautions must be taken to avoid the 
back-flow of gases into the building from the 
open flue of gas or other fuel-burning 
appliances. 

7. This appliance is not intended for use by 
persons (including children) with reduced 
physical, sensory or mental capabilities, or 
lack of experience and knowledge, unless 
they have been given supervision or 
instruction concerning use of the appliance 
by a person responsible for their safety. 

8. Young children should be supervised to 
ensure that they do not play with the 
appliance. 

INSTALLATION GUIDANCE 

1. The installer is responsible for the installation and 
electrical connection of the system on site. It is the 
responsibility of the installer to ensure that the equipment is 
safely and securely installed and left only when 
mechanically and electrically safe. 

2. All regulations and requirements must be strictly 
followed to prevent hazards to life and property, both 
during and after installation, and during any subsequent 
servicing and maintenance. 

3. T

he unit’s condensate drain must be connected to the 

building’s wastewater drainage system. 

4. Certain applications may require the installation of sound 
attenuation to achieve the sound levels required. 

5. The unit must not be connected directly to a tumble 
drier. 

6. The supply and exhaust valves must be fully opened 
prior to commissioning. 

7. The supply air must be drawn from the exterior of the 
property. 

8. The unit should be allowed to stabilise during 
commissioning for a minimum period of 5 minutes when 
changing between boost and normal speeds. 

9. E

nsure that the unit’s external grilles are a minimum of 

1500mm apart. The exhaust grille should be located at 
least 600mm away from any flue outlet. The inlet grille 
should  be located 2000mm away from any flue outlet. 

10. This product and associated duct installation should be 
carried out in accordance with the domestic ventilation 
compliance guide. 

Disposal 

This product should not be disposed of with household 
waste. Please recycle where facilities exist. Check with 
your local authority for recycling advice.

Summary of Contents for Integra Plus EC

Page 1: ...Integra Integra Plus ECA MVHR Kinetic Kinetic Plus E MVHR Installation Commissioning Installation Commissioning Stock Ref N 437666ECA Integra Plus ECA PLEASE RETAIN THESE INSTRUCTIONS WITH THE PRODUCT...

Page 2: ......

Page 3: ...nstruction concerning use of the appliance by a person responsible for their safety 8 Young children should be supervised to ensure that they do not play with the appliance INSTALLATION GUIDANCE 1 The...

Page 4: ...p the Unit 14 Commissioning Overview 14 Modes of Operation 15 Maintenance 16 Spares 16 PRODUCT FICHE 17 UK Building Regulations Part F Declaration of Conformance Integra Plus ECA conform to the 2010 B...

Page 5: ...lings conforming to the latest requirements of the Building Regulations document F 2010 The unit is designed for continuous 24 hour exhaust ventilation of stale moist air from bathrooms toilets and ki...

Page 6: ...Product Description Integra Plus ECA MVHR Installation Commissioning 6 Exploded View of Fan Unit Integra Plus ECA Dimensions 150 22 Cover Heat recovery cell Motor assemblies Base assembly...

Page 7: ...e pipe diameter 22 mm Environmental IP Rating IPX2 Operating Temperature 10 C to 45 C Air Intake Temperature As above Operating Humidity 0 to 95 RH Storage Temperature 10 C to 45 C Storage Humidity 0...

Page 8: ...eight of the unit that you are installing Always use appropriate lifting techniques and appliances when moving heavy equipment Check Site Requirements and Safety Notices Check that the physical and en...

Page 9: ...3 5 TOWARDS THE CONDENSATE DRAIN CONDENSATION DRAIN THE UNIT SHOULD SLOPE DOWNWARDS BY 3 5 TOWARDS THE CONDENSATE DRAIN CONDENSATION DRAIN THE UNIT SHOULD SLOPE DOWNWARDS BY 3 5 TOWARDS THE CONDENSATE...

Page 10: ...Ceiling mounted Invert the unit with the Vent Axia logo facing down and attach the unit securely to the rafters For optimum performance ensure the ductwork does not turn 90 directly off the spigots T...

Page 11: ...20 240 V AC 50 Hz input N Mains Neutral Blue 220 240 V AC 50 Hz input EARTH Mains Earth Yellow Green Earth connector LS1 Switched Live 1 Black 220 240 V AC 50 Hz input LS2 Switched Live 2 Black colour...

Page 12: ...d to the unit and routed into the control housing via a suitable gland to ensure the IP rating of the unit is not affected 3 Connect the other end of the cable to the switched fused spur 4 Use cable c...

Page 13: ...ly the boost button on the Remote Boost Switch may be used LS1 and LS2 inputs can be from a lighting circuit or other mains voltage supply alternatively an optional external control unit can be used N...

Page 14: ...rating any acoustic ducting that all joints are air tight ducting is well supported bends are avoided close to vents and that the vent valves are fully open at the start of the commissioning process C...

Page 15: ...and can only be triggered and cancelled via the Remote Boost switch A 5 second press and hold of the Boost Switch will trigger or cancel Purge Mode Purge mode will timeout after 30 minutes The LED wi...

Page 16: ...r and heat exchanger in warm water using a mild detergent such as Milton Fluid and dry thoroughly NOTE Keep water away from all electrical components and wiring within the unit Motors Inspect the moto...

Page 17: ...Factor CTRL 1 00 0 65 Control Typology Manual Control Local Demand Control Declared Max Internal External Leakage Rates for BVUs or carry over for regenerative heat exchangers only Ext Leakage Rates...

Page 18: ...Notes...

Page 19: ...Integra Plus ECA MVHR Installation Commissioning 19 Notes...

Page 20: ...y part being found to be defective the product will be repaired or at the Company s option replaced without charge provided that the product Has been installed and used in accordance with the instruct...

Reviews: