4.0 Electrical

 

8

 

 

 

4.1 

Electrical Connections

 

 

230V 50Hz 108W max

 

 

 

 

1. Wiring must be via a 3A fused switched spur 
with a 3mm contact separation in each pole. The 
wiring should be suitably (Basec or Har) 
approved cable of appropriate current carrying 
capacity.

 

 

2. Ensure that the mains power supply is 
isolated prior to installation.

 

 

3. The HR200V is supplied with a length of cable 
attached from the factory. This can be extended 
with the use of 4 core cable as required.

 

 

4. Connect the wires as shown in Fig.5 to a Switched 
fused spur or a control unit. If a controller is used follow 
the fitting and wiring instructions supplied with the 
controller ensuring that the black and brown wires are 
connected to the same terminal on the controller. 
 
 
5. If an extract only switch (409999) is to be fitted refer to 
Fig.6. The switch should be connected to the black wire. 
With the switch in the extract only position the unit will no 
longer provide supply air.

 

 

 

 

 

 

 

 
 
 
 
 
                              

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

6

. Switch on the mains electrical supply and 

check the operation of the unit.

 

 

NOTE: 

On operation there is a delay of 30 

seconds prior to the shutter opening.

 

Fig.5. Normal Running 

 

HR200 

Fig.6. Extract only 

 

HR200 

(not supplied)

Summary of Contents for HR200V

Page 1: ...HR200V Ducted Heat Recovery Ventilator Installation and Maintenance Instructions PLEASE READ INSTRUCTIONS IN CONJUNCTION WITH ILLUSTRATIONS PLEASE SAVE THESE INSTRUCTIONS Stock Ref No HR200V 14120010...

Page 2: ...re that they do not play with the appliance INSTALLATION GUIDANCE 1 The installer is responsible for the installation and electrical connection of the sentinel system on site It is the responsibility...

Page 3: ...3 Warnings Safety Information Contents Section Page 1 0 Introduction 4 2 0 Site Requirements 5 3 0 Installation 6 4 0 Electrical 8 5 0 Maintenance 9...

Page 4: ...lation ducting 3 The maximum power consumption for the unit is 108w 4 The twin impeller and heat exchanger arrangement simultaneously supplies and extracts air while transferring heat from the stale e...

Page 5: ...he unit must be sited such that the ambient temperature will not exceed 40 C 9 Do not site the appliance in the vicinity of excessive levels of airborne oil or grease 10 If the unit is installed in a...

Page 6: ...ect an approved electrical control arrangement for the HR200 unit above 2 After considering the site requirements Section 2 0 select a suitable site for the unit and controllers and work out the cable...

Page 7: ...he installation site and fix it in position using four suitable screws and the remaining four supplied washers The washers should be located between the screw heads and the mounting grommets CAUTION E...

Page 8: ...es as shown in Fig 5 to a Switched fused spur or a control unit If a controller is used follow the fitting and wiring instructions supplied with the controller ensuring that the black and brown wires...

Page 9: ...of contamination experienced and according to the following procedure 3 Isolate the mains power supply 4 Remove the ducting to internal grilles Undo the two grille securing screws and remove the spig...

Page 10: ...Control Declared Max Internal External Leakage Rates for BVUs or carry over for regenerative heat exchangers only Ext Leakage Rates for Ducted UVUs 5 Internal 5 External Mixing Rate of Non Ducted BVU...

Page 11: ......

Page 12: ...rating label attached to the unit Has not been subjected to misuse neglect or damage Has not been modified or repaired by any person not authorised by the company IF CLAIMING UNDER TERMS OF GUARANTEE...

Reviews: