background image

Page 5

L109 1210A

16) Plug the motor(s) into the hood and reinstall the blower motor(s) using the three retaining screws that were previously 

removed in Step 8.

17) Replace the blower housing(s) and the blower shield(s). Make sure that the damper(s) open and close smoothly.

18) Refer to the Owner Maintenance Guide Operating Instructions for proper hood operation. Test all blower and light 

functions to ensure they are operating properly.

9)  Install an appropriate 1/2” UL listed electrical wire clamp through each motor box electrical opening on top of the 

hood. Install electrical wiring from the service panel to the hood location for each motor box. Consult the connection 

diagrams (on previous page) for further details on electrical placement.

Installation Details Continued

10) Insert the electrical wire from the service panel into the electrical wire clamp on each motor box. Tighten the wire 

clamp(s).

11) FOR  BACK  VENTING APPLICATIONS  ONLY.  IF  NOT  BACK  VENTING,  SKIP  STEP  12.  PROCEED  DIRECTLY  TO                  

STEP 13.

 

Note: Wall studs may interfere with back venting installations. Additional framing may be required. It is necessary to 

cut duct access hole(s) in the wall prior to installing the hood.

 

To accomplish this, place the appropriate elbow(s) on the bottom of the cabinet in line with the duct hole(s) cut in Step 

4. On the wall, trace around the elbow(s). Be sure to account for the wood thickness of the bottom of the cabinet when 

tracing duct access holes. Remove the elbow(s) from the cabinet. Cut around the outside of the traced line(s), avoiding 

wall studs. Install the duct from the outside of the home to the opening in the wall. Use duct tape to seal joints.

12) Pull the electrical wire slack into the cabinet while raising the hood into position. Using the four screws provided, 

attach the hood to the bottom of the cabinet. Place the appropriate elbow(s) on the top of the hood. Elbow(s) should be 

placed with the non-crimped end(s) on the inside the collar(s) of the exhaust outlet(s). Use duct tape to seal all joints. 

Retract the electrical wire slack into the wall cavity or attic space. SKIP STEPS 13 AND 14. PROCEED DIRECTLY TO 

STEP 15.

13) FOR DIRECT DUCT CONNECTIONS ONLY. IF USING TRANSITIONS PROCEED DIRECTLY TO STEP 14. Pull the electrical 

wire slack into the cabinet while raising the hood into position and aligning the duct(s). The duct(s) should connect 

together as the hood is located in place. Note: The duct work must fit inside the exhaust collar(s). Using the four screws 

provided, attach the hood to the bottom of the cabinet. Use duct tape to seal all joints. Retract the electrical wire slack 

into the wall cavity or attic space. SKIP STEP 14. PROCEED DIRECTLY TO STEP 15.

14) FOR TRANSITION CONNECTIONS ONLY. Pull the electrical wire slack into the cabinet while raising the hood into position. 

Using the four screws provided, attach the hood to the bottom of the cabinet. Connect the appropriate transition(s) 

between the exhaust collar on the top of the hood and the duct work overhead. Note: The bottom of the transition(s) 

should fit inside the exhaust collar(s) on the top of the hood and on the inside of the duct work overhead. Use duct 

tape to seal all joints. Retract the electrical wire slack into the wall cavity or attic space.

15) From inside the hood, using UL listed wire nuts, attach the “neutral” wire(s) to the white lead(s), the “hot” wire(s)  to 

the black lead(s), and the ground wire(s) to the green lead(s) inside the motor box(es).

Warning:  Do not operate hood without  proper ground connection.

Model

Volts

Amps*

Hz

RPM

CFM

[email protected]" Equivalent CFM

CFM

[email protected]"

CFM

[email protected]"

CFM

[email protected]"

Minimum Round

Duct Size

Sones

#

B100 Single

115

1.5

60

1550

300

450

273

245

225

6" (28 in.

2

)

5.4

B200 Dual

115

2.9

60

1550

600

900

531

480

430

8" (50 in.

2

)

6.5

B200 Dual & B100 Single

115

4.4

60

1550

900

1350

804

725

655

VP562: 10" (79 in.

2

)

6.3

Two B200 Duals

115

5.8

60

1550

1200

1800

1062

960

860

VP563: 12" (113 in.

2

)

6.6

*  Add 2.5 amps for each warming light and 0.5 amp for each halogen light.

•  Because the Magic Lung

®

 blower uses centrifugal filtration rather than conventional baffle or mesh filters, the Magic Lung

®

 blower can handle cooking equipment with higher cubic feet per minute (CFM) requirements and can deliver equivalent CFM much more 

efficiently than other than other filtration systems. When comparing the Magic Lung

®

 with other blower units made by other manufacturers, use the “Equivalent CFM”.

#

  Ratings in accordance with the Standard Test Code by the Energy Systems Laboratory of the Texas Engineering Experiment Station.

Reviews: