background image

 

2013.07 

 

  1 / 3

 

1.  INSTALLATION 

Download Installation 

– Operation and Maintenance Instructions forum www.venco.com.tr .Read before 

start-up the unit and keep it. 

During  Installation;  EN  60204-1  rules  should  be  implemented  during  the  final  assembly.  Before  the 

installing of heat recovery units, customers should control whether weight and dimensions of the stations are 
suitable for the places from where stations will pass through and assembly will be carried out. There should 
be  sufficient  amount  of  place  around  the  unit  to  be  able  to  give  service  and  for  piping  connections.  Heat 
recovery units should be assembled onto a hard and flat base. 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Figure 1.1. Connection Schematic 

 

 

INDOOR 
Fresh Air 

INDOOR 

Exhaust Air 

OUTDOOR 

Fresh Air 

OUTDOOR 
Exhaust Air 

Electrical Duct 

Heater 

Connection Duct 

L = 2 D 

Reviews: