2013.07
1 / 3
1. INSTALLATION
Download Installation
– Operation and Maintenance Instructions forum www.venco.com.tr .Read before
start-up the unit and keep it.
During Installation; EN 60204-1 rules should be implemented during the final assembly. Before the
installing of heat recovery units, customers should control whether weight and dimensions of the stations are
suitable for the places from where stations will pass through and assembly will be carried out. There should
be sufficient amount of place around the unit to be able to give service and for piping connections. Heat
recovery units should be assembled onto a hard and flat base.
Figure 1.1. Connection Schematic
INDOOR
Fresh Air
INDOOR
Exhaust Air
OUTDOOR
Fresh Air
OUTDOOR
Exhaust Air
Electrical Duct
Heater
Connection Duct
L = 2 D