2016.09
8 / 28
5.3 Installation
VENCO rules should be implemented during the final assembly. Before the installing of heat recovery units,
customers should control whether weight and dimensions of the stations are suitable for the places from
where stations will pass through and assembly will be carried out. The unit has to be install horizontally, any
angle installation will cause a problem. There should be sufficient amount of place around the unit to be able
to give service and for piping connections. Heat recovery units should be assembled onto a hard and flat
base.
Damages due to wrong transportation-storage-installation are not covered under warranty.
Figure 5.3.1. Connection Schema
Figure 5.3.2. Installation Schema
INDOOR
Fresh Air
Flow
INDOOR
Exhaust
Suction
OUTDOOR
Fresh Air
Suction
OUTDOOR
Exhaust
Flow
Duct Type
Electrical
Heater
Connection Part
L = 2 D
Rot
Compressor
Cover
FAN and Filter
Service Cover
Electrical
Connection Box