General 

The plug-in SLC module provides power for and handles communications to the analogue addressable devices. The 

SLC continuously monitors the analogue values of all devices and displays this value on the control panel as a 

percentage of the alarm threshold value. Up to 254 addresses (500mA max load) can be connected to a single SLC. 

The addressable devices use soft addressing using the VDOT-AD2 handheld programming tool which helps minimise 

the potential for error and reduce the installation time associated with traditional hard addressing. The AUTO-LEARN 

facility provided in the Velocity series control panel saves considerable time and effort when installing a new loop or 

when changing device configuration. 

It allows the system to learn for itself what devices have been installed on the loop. 

 

Installation 

The MMP panel uses the expansion port number to reference modules. It is recommended that any SLC modules are 

fitted first to the first expansion ports, so that the loop circuit numbers follow a logical sequence (loop 1 in port 1, 

loop 2 in port 2 etc.) 

 

 

 

1.

 

Ensure that the installation area is free from any cables or wires that may get caught, and that there is enough 

space on the DIN rail to mount the module. Also ensure that the DIN clip underneath the module is in the open 

position. 

2.

 

Place the module onto the DIN rail, hooking the metal earth clip underneath onto the rail first. 

3.

 

Once the earth clip is hooked, push the bottom of the module onto the rail so that the module sits flat. 

4.

 

Push the plastic DIN clip (located at the bottom of the module) upwards to lock and secure the module into 

position.

 

 

 

VL-SLC [SIGNALING LINE CIRCUIT MODULE] Installation Instructions

 

ATTENTION: 

THE PANEL MUST BE POWERED DOWN, AND DISCONNECTED FROM THE BATTERIES BEFORE INSTALLING 

OR REMOVING ANY MODULES. 

Summary of Contents for VL-SLC

Page 1: ...vices have been installed on the loop Installation The MMP panel uses the expansion port number to reference modules It is recommended that any SLC modules are fitted first to the first expansion port...

Page 2: ...cure In addition the MMP panel is supplied with Din rail stoppers These should be fitted before the first module and after the last module on each rail Before Powering the Panel On 1 To prevent the ri...

Page 3: ...modules are fitted and that all module cables are correctly inserted Note that the panel will need at least one module fitted to run The panel has detected a new module added to a port that was previ...

Page 4: ...panel will report them as removed lighting the yellow Trouble LED intermittently sounding the trouble buzzer and displaying battery removed message on the screen 4 Connect the batteries ensuring that...

Page 5: ...ween isolator modules for Class X wiring Manual stations should be fitted between isolator modules Note If an SLC using Class A wiring is used for 2 or more detection zones short circuit isolators or...

Page 6: ...m SLC Cable Length 2KM Maximum SLC Capacitance 100nF Maximum SLC Baud Rate 4334 bits per second typical Maximum Ground Fault Impedance 10K Wiring Class Class X or Class A Power limited Supervised Oper...

Page 7: ...dressable Sounder Base VDOT SCI Short Circuit Isolator VDOT STB RL Low Power Relay Base VDOT STB SCI Short Circuit Isolator Base VDOT UB4 Standard Detector Mounting 4 Base VDOT UB4 6 Standard Detector...