Velocity VDOT-DOP-AC240V-SCI Instruction Manual Download Page 2

GLT-299-7-16 Rev.0 

Jun 12, 2018 

 

Before Installing 

Disconnect power to the control panel before installing the module. If 

the module is installed in an existing operational system, inform the 

operators and local authorities that the system will be temporarily out 

of service. 

 

Mounting 

Make sure to use a metal UL Listed electrical box (4’’ square) to mount 

the module.   

Secure the module to the box, as shown in Figure 3.   

Note: The module must be mounted in a metal electrical box. 

 

Figure 3 

 

Address Setting 

Use VDOT-AD2 Programmer for setting the address of the module prior 

to installation. VDOT-DOP-AC240V-SCI  has an address given at 

random from factory. Connect the Programmer with the address setting 

port to change the address to any of 1-254 (dec), with reference to the 

instruction manual of VDOT-AD2 Programmer. The address can be set 

regardless of whether power supply from the control panel is turned on 

or off. During setting address, the module does not respond to the 

control panel. 

Set the address of module according to Job data. 

 

Wiring 

All wiring must conform to applicable local codes, ordinances, and 

regulations. 

Install module wiring in accordance with the appropriate wiring 

diagrams.

  

   

 

 

 

 

 

 

 

Refer to the figure 4 for wiring. 

Note: All wiring is power-limited and supervised. 

 

 

 

 

 

 

 

 

 

 

Figure 4 

 

Maintenance 

Routine inspection: Ensure the module is secure and undamaged. 

 

Operation Test 

The purpose of the Operational Test is to confirm the product’s correct 

operation. 

1)  When carrying out site testing of the product, the control panel 

shall be set to “one-man-walk test mode” prior to the test. 

2)  Take any necessary precautions to limit the sounding of the alarm 

sounders/bells and any fire service summoning device. 

3)    Operate an active signal from the control panel to activate the relay 

output of the module, and confirm that the output LED (red) 

illuminates. 

Note: If the test cannot be carried out as terminal wiring is connected, 

remove the wire connected to the dry contacts, and test  between 

terminal 

 

N/C1 , N/O1 and COM1

  N/C2,    N/O2 and COM2

to check 

the module. (When activated, the contact between N/C1 and COM1 (or 

between N/C2 and COM2) is open, and the contact between N/O1 and 

COM1 (or between N/O2 and COM2) is closed.) 

4)    After  the module is brought into the active condition, reset the 

module. It may be necessary to allow a short time to elapse before 

the module is reset. 

 

 

Output1 (Normal status)

Close between N/C1-COM1

Open between N/O1-COM1

Output2  (Normal status)

Close between N/C2-COM2

Open between N/O2-COM2

Lin+
Lin-
Lout+
Lout-

N/C2

COM1

N/C1
N/O1

N/O2
COM2

Loop

-          +

TO NEXT

DEVICE

-          +

Loop

FROM PANEL OR

PREVIOUS DEVICE

Do not connect cables in reverse polarity. Failure to connect the polarity 
correctly could result in damage to the module and/or other equipment.

CAUTION

!

Use cable AWG12-22 for wiring. Do not connect different gauge cables 

at one terminal in order to prevent loosening. Use a fork terminal for 

crimping two cables. 

CAUTION

!

There is a danger of electric shock due to the presence of high voltage (AC250V). 

Never touch the terminals while the power is on. Make sure to turn off the high 

voltage AC power supply before commencing wiring work.

WARNING

Reviews: