7
110332-04 - 2/23
PHTM II
Installation, Operating & Service Instructions
Figure 3-7: Boiler Connections
Air Intake
Vent
Front View
Low Voltage
Knockouts
Boiler
Supply
Boiler
Return
120 VAC
Knockouts
Gas
Condensate Trap
Cleanout
Condensate Drain
Bottom View
REVISIONS
REV.
EN
DATE
DESCRIPTION
DWN
CHK
APVD
A
103-143-14599
9/3/2021
PRODUCTION RELEASE
EJL
TITLE:
FIRST USE:
ITEM NUMBER:
MATERIAL:
ALTA
GENERAL CONFIGURATION
HEAT ONLY UNITS
DES: EJL
CHK: ---
APVD: ---
SCALE: 1:10
SIZE: A
SHEET: 1 OF 1
DATE:
REVISION:
DRAWING NUMBER:
09/03/2021
TS-103-62
A
UNLESS OTHERWISE NOTED:
ALL DIMENSIONS IN INCHES.
TOLERANCES:
X.X ±.1 X.XXX ±.005
X.XX ±.03 ANGLE ±1°
PROPERTY OF
U.S. Boiler Company, Inc.
LANCASTER, PA
THIS DOCUMENT CONTAINS CONFIDENTIAL INFORMATION
AND ITS CONTENTS ARE THE SOLE PROPERTY OF U.S. BOILER
COMPANY, INC. ANY REPRODUCTION IN PART OR AS A
WHOLE WITHOUT THE WRITTEN PERMISSION OF U.S. BOILER
COMPANY, INC. IS STRICTLY PROHIBITED.
THIRD ANGLE
PROJECTION
A
A
B
B
2
2
1
1
3
Specifications
(continued)