background image

-1-

Hydraulic & Fuel Filtration Division

VF-71E Filter Housing Installation Instructions

VEL1658R12 0316 PN09-881
www.velcon.com

Parker Hannifi n Corporation

Hydraulic & Fuel  Filtration Division

1210 Garden of the Gods Road

Colorado Springs, CO 80907 USA

VF-71E Filter Housing

Installation Instructions

DESCRIPTION

Th

  e VF-71E Filter Housing is designed for use in industrial applications with a variety of oils and other liquids. Th

 e 

housing is shipped with no cartridge installed. Cartridges must be ordered separately.

CONNECTIONS SIZE: 3/4" NPT

HOUSING PRESSURE RATING: 150 psi

NOTE:   FOR LIQUID SERVICE ONLY.  Do not use or leak test this fi lter vessel with compressed air or

   other gasses.

INSTALLATION

1.  Install the housing in an area that provides access to the inlet, outlet, and drain fi ttings.  Allow at least 18 inches of 

clearance above the band clamp for cartridge removal.

2.  Make inlet and outlet connections to the appropriately labeled fi ttings.  DO NOT fl ow backwards through the 

housing.

3.  Installation of pressure gauges is recommended to monitor diff erential pressure across the  housing and to allow 

accurate determination of when the fi lter cartridge should be changed. Th

  e auxiliary tap in the vessel lid can be 

used to install a gauge for measuring the pressure  upstream. If the backpressure is expected to vary, it is recom-
mended that gauges be installed upstream and downstream. 

4.  On systems where pressure can exceed 75 psi, a pressure bypass around the pump should be installed to protect 

the cartridge and the system from a high pressure shock of sudden cartridge seal-off  due to a slug of water.

5.  Installation of shut-off  valves on the inlet and outlet lines may be required to isolate the housing during cartridge 

change-out.

6.  Install the cartridge as outlined in the cartridge change-out section.

7.  Write the proper cartridge model number on the enclosed replacement cartridge label, fasten it to the housing 

shell just below the VF-71E label, then cover the cartridge label with the enclosed clear plastic sticker.

OPERATION

1.  Check that all unused fi ttings on the vessel are plugged.

2.  Open the top air vent and check that the bottom housing drain is closed.

3.  Start the pump and verify that air is venting from the housing.  IF NOT, 

TURN THE UNIT OFF; check all lines for
 obstructions.

4.  Allow all air to vent from the housing. Close the top air vent when fl uid 

begins to bleed out.

5. Th

  e vent should be opened periodically to expel any entrapped air.  A  large 

accumulation of air will reduce the fi ltering area of the cartridge.

6.  Check all fi ttings and lid for leakage.  Additional tightening may

be required.

7.  Note the pressure gauge reading. For most oils it will be below 5 psi with a 

clean cartridge.

Reviews: