background image

 

 

TECHNICAL MANUAL 

 

CAMELLIA R 

Made from 1

” x 1” 

galvanized steel pipe 

 

 

Set of product 

Width 10ft   

    Height 7ft 

     Length of 19.5ft   

   Extension 6.5ft etc. 

 

Summary of Contents for CAMELLIA R

Page 1: ...TECHNICAL MANUAL CAMELLIA R Made from 1 x 1 galvanized steel pipe Set of product Width 10ft Height 7ft Length of 19 5ft Extension 6 5ft etc...

Page 2: ...c right hand 2355mm 2 3 End face lintel top 960mm 2 4 Door way post left hand 2020mm 2 5 Door way post right hand 2020mm 2 6 End face transverse member left hand middle 990mm 2 7 End face transverse m...

Page 3: ...le 905mm 2 20 Door diagonal 1425mm 2 21 Door lintel bottom end 905mm 2 22 Door post left hand 1780mm 2 23 Door post right hand 1780mm 2 24 Air gate lintel top 850mm 2 25 Air gate lintel bottom end 850...

Page 4: ...quare cross section of 25 x 25 mm The greenhouse is intended to be covered with multiwall UV protected polycarbonate The end faces and the frame intermediate arches are connected by five longitudinal...

Page 5: ...the extensions No 10 into the end faces of the arch described in cl 2 1 on the left and the right by knocking them in until they are firmly fastened with a mallet or hammer through a block fasten the...

Page 6: ...ct the middle part No 12 of the bottom end transverse part to the left hand and right hand parts with simultaneous attachment of the left hand No 4 and right hand No 5 doorway posts to them Secure the...

Page 7: ...se parts and fasten them with self tapping screws No 41 2 8 Install the left hand No 8 and the right hand No 9 end face diagonals and fasten them with self tapping screws No 41 2 13 Fasten stop plate...

Page 8: ...ct geometry when assembling The doorpost No 23 with hinge holes should be on the right hand side 2 10 Using parts Nos 24 28 and self tapping screws No 41 assemble the air gates Use an angle piece to e...

Page 9: ...vided in cl 2 1 connect the left hand No 14 and right hand No 15 half arc of the intermediate arch Fasten the connection with four self tapping screws No 41 2 on each side 3 2 Insert the extensions No...

Page 10: ...into starter stringers No 32 4 4 Connect intermediate arches to assembled details with bolts washers and nuts No 36 38 inserted into the drilled holes 4 5 Fasten the end face B for greenhouse of 4 m...

Page 11: ...screws No 41 through thermal washers No 42 according to the scheme of polycarbonate fastening 6 4 Put the part 3 of PC to the left hand side of the end face and the part 4 to the right hand side of th...

Page 12: ...mating hinge on the door so that the peg stay fixes the door in the open position 6 7 Insert the hand lever No 43 into the 12 holes on the doors and on the air gates by drilling the corresponding hol...

Page 13: ...tthePC from the end faces at first Install the PC sheets so that they protrude hang down 50 mm beyond the edge of the end face 7 2 Press the first sheet of PC with tightening tape No 35 item 1 and fi...

Page 14: ...Backfill the legs with soil and apply tamping to the ground When lowering the greenhouse into the trench or holes make sure that there is no longitudinal misalignment of the frame and that the tie ba...

Page 15: ...to remove all sheets of multiwall polycarbonate from the arched part of the greenhouse the greenhouse roof by removing tie bands The advantage of sheets removing for winter is that the snow gets insid...

Page 16: ...der proper usage Due to the continuous improvement of the products the manufacturer reserves the right to make changes in the design without prior notice to the consumer The products are not subject t...

Reviews: