7.3.  Regularity of maintenance

It is recommended to perform at least one annual inspection 

of the following aspects:

1.  Sealtight integrity

: check that the transformer does 

not leak dielectric liquid.

2. 

If the machine is fitted with oil level, internal pressure 

and/or temperature indication instruments, check that 

the levels or values measured are appropriate.

If there is a maximum temperature trailing needle, 

it is very important to check that said maximum 

temperature is within the transformer's normal 

operating parameters.

3.  Clean state

: check that the transformer is clean and 

well conserved.

4.  Noise

: check that the transformer does not produce 

strange or untimely noises.

The requirements set out in the applicable legislation 

on transformer stations and substations to protect 

people and property which may be damaged by the 

installations must also be met.

Operation

Elements to be 

controlled

Regularity

Remarks

Thermometer 

Once every 2 years 

Check calibration, contacts and maximum 
temperature value.

Terminal box 

Once every 2 years 

Check connections and clean any dirt. 

Terminals 

Once every 2 years 

Check state and clean 

Tap changer

Once a year 

Move the tap changer through all positions.

Accessories with alarm and trip 

contacts 

Once every 2 years 

Check the conditions of use, the contacts and 
measure the electrical insulation of the circuit.

6

Fans (if fitted)

Once a year 

In the event of an incident such as vibrations or 
abnormal noises, or noticeable defects

7

Winding insulation level 

Once every 6 years

If a change in results is detected after years of use of 
the transformer or when comparing the previous test 
data, carry out oil recirculation treatment without 
applying a vacuum to the tank

Measurement of tan δ 

Once every 6 years 

In the case of inadequate values, carry out oil 
recirculation treatment without applying a vacuum 
to the tank. 

Oil surface tension test 

Once every 6 years

 In the case of inadequate values, carry out oil 
recirculation treatment without applying a vacuum 
to the tank.

10 

Oil acidity value 

Once every 6 years

In the case of inadequate values, carry out oil 
recirculation treatment without applying a vacuum 
to the tank. 

11 

Oil general state test 

Whenever any abnormal data is found in 

operations 7 to 10 

Take a sample of oil and carry out tests indicated in 
Standard IEC 60422 

12 

Oil humidity content test 

Whenever any abnormal data is found in 

operations 7 to 10

 

Table 7.1. 

Operations and maintenance frequency

Summary of Contents for Ormazabal transforma.plur

Page 1: ...LIB transforma plur Transformers with corrugated tank and submerged in dielectric liquid from 3150 kVA General Instructions IG 287 EN version 03 24 07 2020...

Page 2: ...ectrical installations Personnel must be fully familiar with the instructions and warnings contained in this manual and in other recommendations of a more general nature which are applicable to the si...

Page 3: ...ability 13 4 Storage 14 5 Installation 15 5 1 Receiving the transformer 15 5 2 Transformer site 16 5 3 Transformer electrical connections 16 5 3 1 Standard procedure 16 5 3 2 Special transformers with...

Page 4: ...ation point which allows it to maintain high dielectric rigidity values with a high water content High fire resistance natural dielectric ester is classified as a K class liquid fire point 300 C accor...

Page 5: ...azabal is not responsible for an unsuitable choice or use of such means 2 1 Lifting and moving by crane In order to lift and move the transformer by crane it must be taken into account that the liftin...

Page 6: ...uid from 3150 kVA Figure 2 2 Detail of crane hook preparation in the eyebolts Figure 2 3 Detail of lifting a transformer by crane The following indications must be taken into account when completely h...

Page 7: ...ements positioned at the top of the sides for transformers with eyebolts on the tank Figure 2 5 Figure 2 5 Position of the lifting elements ALWAYS lift the transformer using the four lifting elements...

Page 8: ...rs with eyebolts on the tank These elements are invalidated to prevent any use other than to remove the transformer from the tank if this is fitted with lifting elements see Figure 2 7 Figure 2 7 Deta...

Page 9: ...e identified in yellow Figure 2 9 Figure 2 9 Eyebolts on the the tank cover In the case of transformers of lower weight two or four optional eyebolts are available on the cover In the case of transfor...

Page 10: ...to or above 80 with the horizontal of the transformer and must allow fully vertical lifting at all times The slings must not rub or damage the bushings or other accessories ALWAYS lift the transformer...

Page 11: ...her elements suitable for the mass of the transformer as shown on its nameplate The protection tools and equipment provided or recommended by Ormazabal according to the agreement with the customer suc...

Page 12: ...ments When securing the transformer make sure that the lashing or bracing chains do not interfere with any of the transformer s accessories or cooling elements The fastening straps are attached to the...

Page 13: ...enttrafficandtransportregulations in each transit country must be abided by If the transformer s transport will include sections of roads or routes off paved roads with normal conditions the customer...

Page 14: ...kVA 4 Storage If commissioning is not immediate transformers must be stored following the recommendations below Store the transformer horizontally in a clean dry place on firm levelled ground If the t...

Page 15: ...r Check the general state of the transformer and ensure the absence of any knocks in particular on the cooling equipment and the insulators or terminals If the transformer has paint defects it must be...

Page 16: ...l weight which is shown on its nameplate 5 3 Transformer electrical connections 5 3 1 Standard procedure Risk of death by electric shock and of irreversible damage to the transformer or to the electri...

Page 17: ...ions which do not place any strain on the transformer bushings sufficiently sized to prevent excessive overheating and at the same time allow for the dilatations caused by heat without damaging the tr...

Page 18: ...ostatic screen must have its connector bushing identified as P E or E S and must be connected rigidly to the installation s earth preferably the protection earth if there are two earth installations R...

Page 19: ...rmer has been powered it will recover its usual liquid stage 4 Regulate the transformer s voltage using the corresponding tap changer taking into account the following safety precautions Failure to fo...

Page 20: ...ower is achieved while ensuring that the transformer temperature does not go over 105 C In the case of renewable generation transformers connect to the generation source in low generation conditions a...

Page 21: ...d ensure that any static electricity is discharged 5 Delimit and mark the work area properly 6 Check that the transformer does not leak dielectric liquid In case of dielectric liquid leakages contact...

Page 22: ...vements of the transformer Check that the tank valve screws have not become loose due to vibrations If they have tighten securely to prevent any re occurrence 7 2 5 Oil leaks Although it is not normal...

Page 23: ...is rich in anti corrosive pigments of aluminium zinc or similar Ensure that this paint covers the whole area Shake the contain vigorously before applying the spray After applying the primer coat let...

Page 24: ...ections and clean any dirt 3 Terminals Once every 2 years Check state and clean 4 Tap changer Once a year Move the tap changer through all positions 5 Accessories with alarm and trip contacts Once eve...

Page 25: ...1 If after the transformer inspection repairs or modifications are required these operations must be carried out by the Ormazabal 2 If a company other than Ormazabalperforms the repair or modification...

Page 26: ...essary precautions are taken to protect personnel who normally or circumstantially work around it and that those persons not required for its operation are kept at a safe distance away from the transf...

Page 27: ...350 Fastening the palms to the pin stainless steel bolts 25 35 40 60 Bolts to the surface of the palms 25 35 40 70 100 150 Connections at low voltage busbars steel bolt and nut 45 60 65 85 95 130 Medi...

Page 28: ...Subject to change without prior notice For further information contact Ormazabal www ormazabal com Ormazabal Cotradis Transformadores LOECHES Spain...

Reviews: