![VelAir Pebble Mini User Manual Download Page 4](http://html1.mh-extra.com/html/velair/pebble-mini/pebble-mini_user-manual_3873558004.webp)
2. Positioning
2.1 Mark the location on the wall with a pencil. Use the Installation Template to mark the locations
for the three fixing points (fig. 4).
2.2 Pre-drill the wall in the marked locations using 5/16” (8mm) drill, insert the plastic anchors and
tap flush to the wall. If the cable entry is to be done from the wall provide a proper cable exit (fig. 5)
8
100mm
80mm
Power Cable Entry
L
N
6mm
Power Cable Exit
(in case with power cord cable)
3. Installing Power cable & Connection terminal block
WARNING:
ENSURE POWER NOT CONNECTED
3.1 Pull the cable through the hole in the wall mounting bracket. Ensure the cable is long enough
to route correctly through the wall mounting bracket to the terminal block (fig. 6).
3.2 The cable must sit in the dedicated channel.
3.3 As shown, connect cable to terminal block.
3.4 Screw in terminal block.
3.5 Fix the wall mounting bracket to the wall. Screw to the wall using the appropriate fitting (fig
6A). 3.6 Fix the cable cover with the screw to the wall mounting bracket.
CAUTION:
Connect the ground wire to the terminal block marked
“ ”
Do not over-tighten and crush the power cable.
6A
L
N
4
5
4. Fix the Main unit to Wall mounting bracket
4.1 Position the unit centrally above the wall mounting bracket so the metal bracket on the rear is
positioned over the mating part of the wall bracket moulding. Keeping the dryer firmly against the
wall, slowly slide the dryer down until there is no further travel. The dryer should then be electrically
connected (fig 7).
4.2 Insert and tighten the security screw seated on the bottom surface (fig 7A).
6
Summary of Contents for Pebble Mini
Page 1: ...Pebble Mini User Manual...