background image

 
 

SVEX-171

Ex

EX Monitor 

Ver:  1.1 

14 

 

 

 

6. 

Trouble shooting

 

 

Problems

 

Reason

 

Method

 

Remarks

 

 

 

No image

 

 

Power off

 

Replace fuse

 

Do it oneself

 

Check power line

 

Do it oneself

 

Signal line off

 

Check signal line and pin

 

Do it oneself

 

 

 
 

Interference, 

double image

 

Signal line broken

 

Check signal line

 

Do it oneself

 

Interference 

 

appears in the line

 

 

Look up interference source

 

 

Do it oneself

 

Transfer distance is 

 

too long

 

Signal transfer is less than 

 

15 meters

 

 

Do it oneself

 

 

Display color is 

unusual

 

Pin connection is 

 

not good.

 

 

Check pin and receptacle

 

 

Do it oneself

 

 

Software set wrong

 

Start software to adjust 

 

display effect

 

 

Do it oneself

 

Picture overturn

 

Resolution ratio 

 

is too low

 

Resolution ratio set 

 

wrong

 

 

Adjust Resolution ratio again

 

 

Do it oneself

 

 

 

7. 

Shipment and storage

 

 

 

After package, without rain or snow fall directly to product, shipment could do by air or sea and 

store for one year under the environment of -20

~+60, humidity >90%. 

 
 

8. 

Guarantee

 

 

 

For any camera produced by Veilux, we promise a one year to repair warranty. 

During Guarantee period, we supply free service except following situations: 

„  

User does not operate as manual book requires 

„  

User un-install the whole product by themselves 

„  

Lightning or Act of God 

 

If  there  are  additional  agreements  between  Veilux  and  buyer,  then  agreements  shall  be 

strictly done. 

 

 

9. 

Statement

 

 

„  

Veilux owns   the  final  design  changing  and  final  specification  rights  and  no 

Summary of Contents for SVEX-171

Page 1: ...Ex mark ATEX Certificate License Exd BT6 DIP A21 TA T6 CNEx06 1580 XK06 123 00251 Veilux SVEX 171 Explosion Proof Monitor...

Page 2: ...lameproof humidity could not go outside Connect the cables correctly under the demand of manual book and press tighten nut 2 Maintenance Please shut off before maintenance and repair Pay attention to...

Page 3: ...2 8 Installation Size 7 3 Installation 7 3 1 Desktop installation 7 3 2 Wall Mount Installation 8 3 3 Hoisting 8 3 4 Cable Treatment 9 3 4 1 Use Ex proof Flexibility Tube 9 3 4 2 Connect power cable...

Page 4: ...ious connections will make flexible application Strictly according to European Directive EC 94 9 and EN50014 Standards of GB3836 1 2000 GB3836 1 2000 Electrical apparatus for explosive atmosphere Gene...

Page 5: ...15 needles D SUB Video input BNC pin 2 4 Technical data Panel type TFT LCD Display area 17 inch diagonal Pixel density 0 264 x 0 264 mm Best resolution ratio 1280 x 1024 60Hz Available area 337 9 x 2...

Page 6: ...H x 424 W x 200 D mm Len size 384 x 316 mm Glass thickness 12mm Inner cubage 3L Outlet hole quantity 2 Outlet hole screw thread size G 3 4 2 6 Environmental Air Pressure 86 106KPa Environment Temperat...

Page 7: ...displayer can be used corresponding to YHIC ex proof IPC It also can be used as a monitor to watch video signal It usually is set on the table directly Lamp stand is also fixed with bolt 3 Displayer...

Page 8: ...mount installation to save room If we adjust the combination of lamp stand we can achieve the aim Screen can be adjusted Tilt 18 when wall mount installation 7 Wall mount installation 8 Lamp stand is...

Page 9: ...corresponding ex proof flexibility tube reach the demand of ex proof before leave factory 3 4 1 Use Ex proof Flexibility Tube a As Picture 11 turn on the tighten nut behind the back of the displayer T...

Page 10: ...x proof Flexibility Tube 13 d As picture 14 the design sketch after installation 14 The design sketch after install ex proof flexibility 3 4 2 Connect power cable Power cable is a 3 core cable it must...

Page 11: ...of welding when application Please pay attention to the operational tools Professional soldering station is recommended to use Power off soldering iron when welding 15 15 contact pin D connector 2 VG...

Page 12: ...d in equipment interval reaches the demand of ex proof after tighten nut The demand of cable external diameter as following 3 The demand of cable external diameter size seal ring inner hole diameter m...

Page 13: ...get to Enclosure shall burden water pressure testing for 1 0Mpa for 10 12 seconds without leakage as pass which is ordered in GB3836 2 2000 Camera surface temperature max shall not over 80 while it i...

Page 14: ...play effect Do it oneself Picture overturn Resolution ratio is too low Resolution ratio set wrong Adjust Resolution ratio again Do it oneself 7 Shipment and storage After package without rain or snow...

Page 15: ...s manual book belongs to Veilux rights without permits or any book inform any company or private copy of whole or part of the book shall be prohibited 802 GREENVIEW DR STE 200 GRAND PRAIRIE TX 75050 W...

Reviews: