Cable Connection And Specification

 

Connecting power cable and grounding cable, it is recommended that the user add an air 

switch and fuse  protection circuit to the PLC power input. The connection example of AC 

power supply and auxiliary power supply is shown in the figure below. 
   

Connect the PLC 

  terminal to the grounding electrode. To ensure reliable grounding cable 

connection, which makes the equipment safer and protects it from EMI. use AWG12~16 cable, 

and make the cable as short as possible. 
Avoid sharing route with the grounding cable of other equipment (particularly those with strong 

EMI). See the following figure. 

 

  Cable specification 

When  wiring  a  PLC,  use  multi-strand  copper  wire  and  ready-made  insulated  terminals to 

ensure the quality. The recommended model and the cross-sectional area of the cable are 

shown in the following table. 

Wire 

Cross-sectional 

area 

Recommended 

model 

Cable lug and heat-shrink tube 

AC power cable (L, N) 

1.0

2.0mm² 

AWG12, 18 

H1.5/14 round insulated lug, or tinned 
cable lug 

Grounding cable (

2.0mm² 

AWG12 

H2.0/14 round insulated lug, or tinned 
cable end 

Input signal cable (X) 

0.8

1.0mm² 

AWG18, 20 

UT1-3 or OT1-3 solderless lug 
Φ3 or Φ4 heat shrinkable tube 

Output signal cable (Y) 

0.8

1.0mm² 

AWG18

20 

 
Fix  the  prepared  cable  head  onto  the  PLC  terminals  with  screws.  Fastening  torque: 

0.5~0.8Nm. 
The recommended cable processing-method is shown in the following figure. 

 

6    Power-on Operation And Maintenance 

6.1    Startup 

Check the cable connection carefully. Make sure that the PLC is clear of alien objects and the 

heat dissipation channel is clear. 
1. Power on the PLC, the PLC POWER indicator should be on.   
2. Start the AutoStudio software on the PC and download the user program to the PLC.   
3. After checking the download program, switch the mode selection switch to the ON position, 

the RUN indicator should be on. If the ERR indicator is on, the user program or the system is 

faulty. Loop up in the VC series PLC Programming Manual and remove the fault.   
4. Power on the PLC external system to start system debugging. 
6.2    Routine Maintenance 

Do the following:   
1. Ensure the PLC a clean environment. Protect it from aliens and dust. 
2. Keep the ventilation and heat dissipation of PLC in good condition.   
3. Ensure that the cable connections are reliable and in good condition. 
 

 

1. Never connect the transistor output to an AC circuit (like 220Vac). The design of the output 

circuit must abide by the requirements of electric parameters, and no over-voltage or over-

current is allowed.   
2. Use the relay contacts only when necessary, because the use life of relay contacts depends 

largely on its action times.     
3. The relay contacts can support loads smaller than 2A. To support larger loads, use external 

contacts or mid-relay.   
4. Note that the relay contact may fail to close when the current is smaller than 5mA. 
 
 

Notice 

1. The warranty range is confined to the PLC only. 
2. Warranty period is 18 months, within which period Emerson Network Power conducts free 

maintenance  and  repairing  to  the  PLC  that  has  any  fault  or  damage  under  the  normal 

operation conditions. 
3. The start time of warranty period is the delivery date of the product, of which the product 

SN is the sole basis of judgment. PLC without a product SN shall be regarded as out of 

warranty.     
4. Even within 18 months, maintenance will also be charged in the following situations: 

 

Damages incurred to the PLC due to mis-operations, which are not in compliance with 

the User Manual; 

 

Damages incurred to the PLC due to fire, flood, abnormal voltage, etc; 

 

Damages incurred to the PLC due to the improper use of PLC functions. 

5. The service fee will be charged according to the actual costs. If there is any contract, the 

contract prevails. 
6. Please keep this paper and show this paper to the maintenance unit when the product 

needs to be repaired. 
7. If you have any question, please contact the distributor or our company directly. 
Veichi Electric Co., LTD. 
Web

www.veichi.org

   

Version: V1.0    Date : 2021-05-25 

PLC

PLC

Other

equipment

Other

equipment

PLC

Other

equipment

Best

Good

Bad

 5.0

 5.0

UT solderless lug

Heat shrinkable tube

Cable SN label

Cable

OT solderless lug

Heat shrinkable tube

H type round insulated lug

Tinned cable end

Cable

PG

18

47

682

Warning

Reviews: