background image

3

P

roduct description

3

.

1

S

tructure

T

he scope of delivery encompasses

:

l

VEGABOX

02

breather housing

l

P

rotective cover

(

optional

)

l

D

ocumentation

-

this operating instructions manual

T

he

VEGABOX

02

consists of the components

:

l

B

reather housing

l

T

emperature transmitter for

P

t

100

(

optionally integrated

)

l

P

rotective cover

(

optional

)

2

1

3

F

ig

.

1

:

VEGABOX

02

1

H

ousing cover

2

H

ousing

3

B

reather facility

3

.

2

P

rinciple of operation

VEGABOX

02

is a breather housing for pressure transmitters with

connection cable with integrated capillary lines

.

I

t is particularly

suitable for the following

VEGA

pressure transmitters

:

l

VEGAWELL

52

-

4

20

m

A

l

VEGAWELL

52

-

4

20

m

A

l

VEGAWELL

52

-

4

20

m

A

/

HART P

t

100

l

VEGAWELL

72

-

4

20

m

A

l

VEGAWELL

72

-

4

20

m

A

/

HART

l

VEGAWELL

72

-

4

20

m

A

/

HART P

t

100

T

he connection cable of the sensor as well as the power supply cable

are connected to the

VEGABOX

02

.

C

onnection is carried out via

screw terminals

.

S

cope of delivery

C

onstituent parts

A

pplication area

V

oltage supply

VEGABOX

02

7

3

P

roduct description

32798

-

EN

-

110926

Q-Pulse Id: TMS119

26/09/2012

Page 7 of 24

Summary of Contents for VEGABOX 02

Page 1: ...Operating Instructions VEGABOX 02 Document ID 32798 Process pressure Hydrostatic Q Pulse Id TMS119 26 09 2012 Page 1 of 24...

Page 2: ...transport and storage 8 4 Mounting 4 1 General instructions 9 4 2 Instructions for installation 9 5 Connecting to power supply 5 1 Preparing the connection 10 5 2 Connection procedure 11 5 3 Wiring pl...

Page 3: ...safe use and operation of the instrument the operating instructions manual of the respective pressure transmitter is also required Editing status 2011 09 15 VEGABOX 02 3 Contents 32798 EN 110926 Q Pul...

Page 4: ...ice by them 1 3 Symbolism used Information tip note This symbol indicates helpful additional information Caution If this warning is ignored faults or malfunctions can result Warning If this warning is...

Page 5: ...instructions This is a high tech instrument requiring the strict observance of standard regulations and guidelines The user must take note of the safety instructions in this operating instructions man...

Page 6: ...continuously improving company environmental protection The environment management system is certi ed according to DIN EN ISO 14001 Please help us ful l this obligation by observing the environmental...

Page 7: ...breather housing for pressure transmitters with connection cable with integrated capillary lines It is particularly suitable for the following VEGA pressure transmitters l VEGAWELL 52 4 20 mA l VEGAWE...

Page 8: ...and possible transit damage immediately at receipt Ascertained transit damage or concealed defects must be appropriately dealt with Up to the time of installation the packages must be left closed and...

Page 9: ...acility as on the measuring point Otherwise the measured value can be adulterated Use the recommended cables see chapter Connecting to power supply and tighten the cable gland 4 2 Instructions for ins...

Page 10: ...industrial areas screened cable should be used Use cable with round cross section A cable outer diameter of 5 9 mm 0 2 0 35 in ensures the seal e ect of the cable gland If you are using cable with a...

Page 11: ...lisation currents are expected the connection on the processing side must be made via a ceramic capacitor e g 1 nF 1500 V The low frequency potential equalisation currents are thus suppressed but the...

Page 12: ...entry The seal ring must completely encircle the cable 9 Connect the supply cable according to steps 3 to 8 10 Screw the housing cover on The electrical connection is nished 5 3 Wiring plan 1 2 1 2 3...

Page 13: ...mometer Pt 100 3 Shielding3 Wire number Wire colour Polarity VEGABOX 02 terminal 1 brown 1 2 blue 2 3 White 3 4 Yellow 4 5 Red 5 6 Black 6 2 Connect screen to ground terminal Connect ground terminal o...

Page 14: ...the processing system signal temperature transmitter 3 Shielding4 Wire number Wire colour Polarity VEGABOX 02 terminal 1 brown 1 2 blue 2 Shielding Ground Wire number Wire colour Polarity Terminal te...

Page 15: ...ructions manual of the respective sensor 6 2 Setup steps temperature transmitter Setup and adjustment of the temperature transmitter are carried out according to the respective operating instructions...

Page 16: ...you help us carry out the repair quickly and without having to call back for needed information l Print and ll out one form per instrument l Clean the instrument and pack it damage proof l Attach the...

Page 17: ...separable WEEE directive 2002 96 EG This instrument is not subject to the WEEE directive 2002 96 EG and the respective national laws Pass the instrument directly on to a specialised recycling company...

Page 18: ...t from the WIKA data sheet TE 32 03 You can nd the data sheet under www wika com Resistance thermometer mounted into VE GAWELL Pt 100 according to DIN EN 60751 Operating voltage UB 12 42 V DC Signal c...

Page 19: ...at s why the associated approval documents have to be noted with these instruments They are part of the delivery or can be downloaded under www vega com via VEGA Tools and serial number search as well...

Page 20: ...118mm 4 41 64 108mm 4 1 4 5 m m 1 3 6 4 M20x1 5 Fig 7 VEGABOX 02 VEGABOX 02 with protective cover 100mm 3 15 16 72mm 2 53 64 130mm 5 1 8 139mm 5 15 32 Fig 8 VEGABOX 02 with protective cover 20 VEGABOX...

Page 21: ...its VEGA sont globalement prot g es par des droits de propri t intellectuelle Pour plus d informations on pourra se r f rer au site http www vega com VEGA lineas de productos est n protegidas por los...

Page 22: ...22 VEGABOX 02 9 Supplement 32798 EN 110926 Q Pulse Id TMS119 26 09 2012 Page 22 of 24...

Page 23: ...VEGABOX 02 23 9 Supplement 32798 EN 110926 Q Pulse Id TMS119 26 09 2012 Page 23 of 24...

Page 24: ...e ISO 9001 All statements concerning scope of delivery application practical use and operating conditions of the sensors and processing systems correspond to the information avail able at the time of...

Reviews: