background image

11

5 Connecting to power supply

Conductive probe EL 2 • 

54461-EN-220324

5  Connecting to power supply

5.1  Preparing the connection

Always keep in mind the following safety instructions:

Warning:

Connect only in the complete absence of line voltage.

• 

The electrical connection must only be carried out by trained, 

qualified personnel authorised by the plant operator.

• 

Always switch off power supply, before connecting or disconnect-

ing the instrument.

You can find the electrical connection of EL 2 in the operating 

instructions manual of the corresponding controller. 
You can find suitable controllers in chapter " 

Technical data

". 

The instrument is connected with standard two-wire cable without 

shielding. If electromagnetic interference is expected which is above 

the test values of EN 61326 for industrial areas, shielded cable should 

be used.
Make sure that the cable used has the required temperature resist-

ance and fire safety for max. occurring ambient temperature
Use cable with round cross-section. A cable outer diameter of 

5 … 9 mm (0.2 … 0.35 in) ensures the seal effect of the cable gland. 

If you are using cable with a different diameter or cross-section, 

exchange the seal or use a suitable cable gland.

5.2  Wiring plan

You can find the electrical connection of EL 2 in the operating 

instructions manual of the corresponding controller. 

1

3

2

Fig. 5: Connection compartment
1 Ground

2 Max.

3  Outer ground terminal

Instruments with Ex or WHG approval require a line break monitor-

ing. Please note the Ex-specific safety information for installation and 

operation in Ex areas.

The line break monitoring is required for probes with approval accord-

ing to WHG (WRA) or Ex.

Note safety instructions

Voltage supply

Connection cable

Connection compartment

Line monitoring with 

VEGATOR 131, 132

Summary of Contents for EL 2

Page 1: ...Operating Instructions Conductive rod electrode Conductive probe EL 2 Document ID 54461...

Page 2: ...description 6 3 1 Configuration 6 3 2 Principle of operation 7 3 3 Adjustment 7 3 4 Packaging transport and storage 7 4 Mounting 9 4 1 General instructions 9 4 2 Mounting instructions 9 5 Connecting...

Page 3: ...s to the Docu ment ID By entering the Document ID on www vega com you will reach the document download Information note tip This symbol indicates helpful additional infor mation and tips for successfu...

Page 4: ...mounting or adjustment Damage to property and persons or environmental contamination can result Also the protective characteristics of the instrument can be impaired 2 4 General safety instructions T...

Page 5: ...xplosion proof areas Ex only devices with cor responding Ex approval may be used Observe the Ex specific safety instructions These are an integral part of the operating instructions and are enclosed w...

Page 6: ...EL 2 1 Housing lid 2 Housing 3 Process fitting To create a measuring system you need one conductive probe and a VEGATOR 131 132 256C 631 or 632 controller The type label contains the serial number of...

Page 7: ...ured for amplitude and phase position by the electronics of the controller and converted into a switching command EL 2 is operated with an external processing unit The connected controller powers EL 2...

Page 8: ...on the outside Unless otherwise indicated the packages must be stored only under the following conditions Not in the open Dry and dust free Not exposed to corrosive media Protected against solar radia...

Page 9: ...cted e g through cleaning processes or on cooled or heated vessels Fig 2 Measures against moisture ingress Do not hold EL 2 on its electrode rods Particularly with long rod ver sions the sensor can be...

Page 10: ...4 Inflowing medium The probe should protrude into the vessel to avoid buildup For that reason avoid using high mounting bosses for screw in fittings This applies particularly to use in adhesive produ...

Page 11: ...industrial areas shielded cable should be used Make sure that the cable used has the required temperature resist ance and fire safety for max occurring ambient temperature Use cable with round cross s...

Page 12: ...blue in conjunction with a VEGATOR 131 132 controller 1 Fig 6 Supplementary electronics for line break monitoring in conjunction with VEGATOR 131 132 1 Connection cable blue in conjunction with the V...

Page 13: ...minal 2 measuring electrode 3 Additional electronics for line break monitoring 4 Outer ground terminal If you are using a probe without additional electronics for line break monitoring a fault signal...

Page 14: ...14 6 Setup Conductive probe EL 2 54461 EN 220324 6 Setup 6 1 General information You can find the setup procedure for EL 2 in the operating instructions manual of the corresponding controller...

Page 15: ...res not be successful please call in urgent cases the VEGA service hotline under the phone no 49 1805 858550 The hotline is manned 7 days a week round the clock Since we offer this service worldwide t...

Page 16: ...o voltage sup ply and carry out the listed steps in reverse order 8 2 Disposal Pass the instrument on to a specialised recycling company and do not use the municipal collecting points Remove any batte...

Page 17: ...n partly insulated PTFE Electrode rod PTFE partly insulated 316Ti Alloy C4 2 4610 Materials non wetted parts Housing 316Ti Housing lid PBT Seal between housing and housing lid NBR Cable gland PA stain...

Page 18: ...n the associated approval documents of these instruments have to be carefully noted They are part of the delivery or can be downloaded by entering the serial number of your instrument into the search...

Page 19: ...e Schutzrechte N here Informationen unter www vega com Les lignes de produits VEGA sont globalement prot g es par des droits de propri t intellec tuelle Pour plus d informations on pourra se r f rer a...

Page 20: ...ing scope of delivery application practical use and operat ing conditions of the sensors and processing systems correspond to the information available at the time of printing Subject to change withou...

Reviews: