Vega BS / User Manual
15
Revision 26 of 13 April 2022
MOUNTING RECOMENDATIONS
The necessary stage for the network deploying including a big quantity of end devices is
a radio planning work with nature experiments.
For mounting you will need:
cross-shaped screwdriver for gateway assembling;
mounting belts and tool for them;
wire cutters;
a set of tools for cable crimping (stripper, crimper, twisted pair tester, cap,
connector);
antenna mounting wrenches;
laptop.
Step by step mounting guide:
1.
Setting the gateway is usually carried out in the office (see Network Deployment
Manual).
2.
Determination of suitable places for mounting at the object with a network tester —
radio planning work.
3.
Antenna placement and mounting. It’s important to place the gateway antenna
properly for high-quality signal reception. Antenna installing recommendations see
below.
4.
Connection POE-injector cable to the gateway. To do this, you need to pass it
through the cable gland of the case, and then crimp it with an Ethernet connector.
5.
Gateway placement on the pole with mounting belts.
6.
Power applying on the POE.
7.
By the laptop you can make sure that the device successfully sends the data.
8.
Installing of gateway case top.