background image

Quick R

ef

er

ence Guide

VePAL V300 

V-SAM

The Verification Experts

Common F

ea

tu

re

s

Summary of Contents for V-SAM VePAL V300

Page 1: ...Quick Reference Guide VePAL V300 V SAM The Verification Experts Common Features...

Page 2: ...t the service is compliant to its bandwidth profile and service acceptance criteria and is broken down into two phases Phase 1 Service Configuration test The services running on the same line are test...

Page 3: ...nto three presentation areas LEDs Displays soft LEDs associated with Errors and Alarms Tools Management port IP connection status Fiber Scope ReVeal EZ Connect Utilities Applications Help Settings Fil...

Page 4: ...commands to a remote unit To establish an IP connection from the Home menu tap the IP menu and configure the connection for static or DHCP If static configure the Local IP Subnet and Gateway IP addre...

Page 5: ...t Setup screen 10 100 1000Base T port settings Auto Negotiation on or off forced speed and duplex and Flow Control 1000 Base X port settings Auto Negotiation on or off and Flow Control 10GE port setti...

Page 6: ...From the Home menu tap on the V SAM menu 8 Configure the General tab Select the number of Services to be tested up to 8 on 1GE and up to 10 on 10GE Select if the results should be displayed in ULR or...

Page 7: ...reen To modify the settings for whether the V SAM test continues or stops at a test failure for STOP V SAM on TEST FAILURE choose Enable or Disable If Disable is selected V SAM tests will continue eve...

Page 8: ...tag if applicable Use to copy the Header settings from one specific Service number to one or more other Service numbers 12 Configure the MAC address for Layer 2 IP address for Layer 3 IP header VLAN...

Page 9: ...end frames that will be forwarded on a best effort basis but may be dropped in the event of congestion within the network Enable Disable Traffic Policing Test this test ensures that traffic in excess...

Page 10: ...erval 16 Before starting the V SAM test a loopback at the far end is required Choose one of the following options Place a physical loop at the far end for Layer 1 tests Setup a remote VePAL unit in Lo...

Page 11: ...ils use the Service tabs CIR test The test passes if all measured values are below the thresholds configured If a threshold is disabled it will not be evaluated towards pass fail criteria CIR EIR test...

Page 12: ...curate However we reserve the right to change any contents at any time without notice We accept no responsibility for any errors or omissions In case of discrepancy the web version takes precedence ov...

Reviews: