V
E C TO R
Q
UA D S
Pivot Tube Assembly
1. Slide
the
Alloy Steel Dowel Pin M2x16
onto the
Rod End.
Insert the
Alloy Steel Dowel Pin M2x16
into the holes on the
Tube Clamps
as shown.
2. Position
the
Tube Clamp
assembly within the
Tube Pivot Block
and
push the
12mm Tube
through the holes using a twisting motion.
3. Align the holes on the tube with the threaded holes on the clamps and use two
Button Head
Cap Screws M2x0.4x18
to secure the tube in place.