O
PERATIONS
M
ANUAL
T
IME
P
ROGRAMING FOR
TCY-MZ
Doc: 70-00-0989A, 20220920
© Vector Controls GmbH, Switzerland
Page 5-6
Subjects to alteration
www.vectorcontrols.com
V
ECTOR
7.
Press the ( ) or ( ) button to select between programs
Pr 01
…
Pr 08
8.
Press the ( /
) button to set the time the program will execute.
Press the ( ) ( ) button to adjust the time
from 00:00…23:45 in
15 minutes steps.
➔
1 bar indicate setting step 1 is executed.
9.
Press the ( /
) button to select Monday (Day 1).
Note: Monday is day 1 of the week.
10.
Press the ( ) button to execute the program on Monday (Day 1).
➔
The first triangle symbol is displayed.
11.
Press the ( ) button to
not
execute the program on Monday
(Day 1).
➔
The first triangle symbol disappears.
12.
Press the ( /
) button to go to the next day.
➔
Pr01
(Program 1) and
DAY1
(Day 1) is displayed in this example.
➔
2 bars indicate setting step 2 is executed.
Execute on day 1
No execute on day 1
13.
Repeat this process to set
DAY2
to
DAY7
(Tuesday to Sunday).
➔
Triangle symbol indicate the days of the week the program will be
executed.
Day of the week, Monday is day 1
14.
Press the ( /
) button to select the setpoint adjustment.
15.
Press the ( ) ( ) button to change the setpoint.
➔
3 bars indicate setting step 3 is executed.
16.
Press ( /
) to complete the setting of a timed event.
17.
Now you are back in menu "program selection" (instruction No. 7).
Start creating the next weekly schedules for program 2 to 8 as
required.
To go back to the previous submenu, press the ( ) button (1x).
Default preprogrammed weekly time schedules
These switching times are preprogrammed:
Program Id
Day of the Week
Activation Time
Setpoint Value
PRO1
Monday to Sunday (Day 1 to Day 7)
07:00
50%
PRO2
Monday to Sunday (Day 1 to Day 7)
17:00
100%
PRO3
Monday to Sunday (Day 1 to Day 7)
20:00
25%