49
GETTING TO KNOW YOUR ECS-9755/9655 GTX950
2.6.2 Ignition Control Wiring
To activate ignition control, you need to provide IGN signal via the 3-pin
pluggable terminal block located in the back panel. Please find below the
general wiring configuration.
For testing purpose, you can refer to the picture above to simulate ignition
signal input controlled by a latching switch.
Note:
1. DC power source and IGN share the same ground.
2. ECS-9755/9655 GTX950 supports 10V to 36V wide range DC power input in
ATX/AT mode. In Ignition mode, the input voltage is fixed to 12V/24V for car
battery scenario.
3. For proper ignition control, the power button setting should be “Power down”
mode.
In Windows, for
example, you need
to set “When I press
the power button” to
“Shut down.”
Pin No.
Definition
1
Ignition (IGN)
2
External Power S/W +
3
External Power S/W +
IGN
V+
Summary of Contents for ECS-9655-505MGTX950
Page 2: ...ii Version Date Page Description Remark 1 0 04 12 2017 All Official Release Record of Revision...
Page 60: ...53 HARDWARE INSTALLATION Step 6 Finish Step 5 Open the module...
Page 66: ...59 HARDWARE INSTALLATION Step 3 Finish Step 4 Install SSD HDD...
Page 68: ...61 HARDWARE INSTALLATION Step 2 Fasten 4pcs KHS 6 32 screws and then finish...