Model # AVC9001GB
Please call for replacement parts or assistance:
1-866-942-5362
VAS Furniture Mfg. Inc.
Factory No. 33-10944
Page 4
Assembly Instructions
Note: Please do not fully tighten all bolts until you finish assembling all parts, then go back and
fully tighten all bolts, this will make it easier during assembly of unit.
1. Unpack the unit and confirm that you have all the hardware and parts required.
2. Locate Back Panel (D) and set back face down on a non-abrasive surface as shown in detail
#1.
3. Align and attach three Shelf Frames (A, B & C) onto the Back Panel (D) using the 1 1/4
”
Bolts (1) with Washers (4 & 5) through the back rail holes into the threaded inserts on Back
Panel. Make sure the metal tabs for suction on Shelf Frame are up. Fasten all bolts with
Allen Wrench provided. See detail #1.
4. Attach two Floor Levelers (6) to the bottom threaded inserts on the Bottom Shelf Frame (C)
for the necessary adjustment, as shown in detail #1.
Required hardware in this step
Description:
(3)- 1 1/4” Bolt (4)- Lock Washer (5)- Flat Washer (6)- Floor Leveler
Sketch
Qty.
(7pcs)
(7pcs)
(7pcs) (2pcs)
Tools Required: Allen Wrench