NOTE:  

If the colors of the wires in the control cable differ from those referenced on the label 

or shown in the following diagrams, refer to the notes you made when connecting the control 
cable  to the junction box cover at  the scorekeeper’s location.   Ensure  that  each lead on the 
junction  box  cover  is  connected  to  the  same  color  lead  on  the  scoreboard  terminal  block, 
regardless of the color(s) of the wires in the control cable that connect them. 
  

  Re-secure the signal/power access door to the scoreboard. 

 

NOTE:

  Even if the control cable was not buried in conduit, it must be run in sealed, watertight, 

conduit from the ground up to the signal cable/power access door located on the back of the 
scoreboard.  Here, it must pass through a rain-tight conduit fitting where it  will connect to the 
signal cable terminal block inside the scoreboard.  Refer to the installation diagram on page 7 
for a detailed illustration. 
 

RUNNING/CONNECTING THE ELECTRICAL SERVICE 

 

NOTE:

    HAVE  A  LICENSED,  QUALIFIED  ELECTRICIAN  RUN  THE  ELECTRICAL  SERVICE  AND 

CONNECT  IT  TO  THE  SCOREBOARD  IN  ACCORDANCE  WITH  THE  DIAGRAM  ON  THE 
FOLLOWING  PAGE.    A  WATERTIGHT,  NON-FUSIBLE  DISCONNECT  SWITCH,  A  20-AMP 
GROUND FAULT INTERRUPTER, AND A SAFETY GROUND SHOULD BE INSTALLED FOR THE 
20-AMP CIRCUIT CONNECTED TO THE SCOREBOARD.  A 120-VOLT CIRCUIT MUST ALSO BE 
INSTALLED IN A STANDARD DUPLEX OUTLET AT THE SCOREKEEPER’S LOCATION FOR THE 
CONTROLLER’S 12-VOLT DC WALL TRANSFORMER. IF A BATTERY PACK WAS PURCHASED 
WITH THE CONTROLLER, THIS OUTLET BECOMES OPTIONAL. 

 
 

TESTING THE INSTALLED SYSTEM 

 

NOTE:  Please refer to the OPERATORS MANUAL to operate the scoreboard. 

 

Connecting cable-controlled systems: 

 

Connect one end of the supplied 20-ft. control cable into either of the two control cable jacks on 
the  back  of  the  controller  and  the  other  into  the  receptacle  on  the  supplied  junction  box  cover 
installed at the scorekeeper’s location. 

 

Summary of Contents for 3355

Page 1: ...1 INSTALLATION INSTRUCTIONS FOR MODEL 3355 www varsityscoreboards com...

Page 2: ...ion Overview 4 Product Specifications 4 Determining Location and Orientation 5 Installing Mounting Poles or I Beams 5 Mounting the Scoreboard 6 Running and Connecting the Control Cable 9 Running and C...

Page 3: ...volt DC wall transformer Cable controlled systems standard 1 20 ft control cable 1 Junction box covers with built in 5 pin din socket 1 Customer specified length of control cable Wireless systems opti...

Page 4: ...stalled system 9 Fax return warranty activation sheet to Scoreboard Service Company at 270 753 3773 PRODUCT SPECIFICATIONS Overall Dimensions 9 L x 6 W x 8 D shipped in one 1 section Weight Hanging we...

Page 5: ...en installing the poles I beams that support the scoreboard it is important to keep the spacing accurate and the faces straight If you are using beams a good way to keep the faces straight is to clamp...

Page 6: ...egarding this installation A local architect structural engineer or sign installer may also be a source of assistance IMPORTANT DO NOT MOUNT THE SCOREBOARD TO A WALL A MINIMUM OF 18 24 CLEARANCE MUST...

Page 7: ...nd bottom 4 If using steel I beams either weld the mounting flanges to the supports or drill the mounting flanges and supports to use bolts washers and nuts to secure the scoreboard to the I beams 5 I...

Page 8: ...8...

Page 9: ...le into a 2x4 single gang junction box located within 10 feet of the scorekeeper Connect the leads inside the control cable to those on the junction box cover according to the label on the junction bo...

Page 10: ...efer to the installation diagram on page 7 for a detailed illustration RUNNING CONNECTING THE ELECTRICAL SERVICE NOTE HAVE A LICENSED QUALIFIED ELECTRICIAN RUN THE ELECTRICAL SERVICE AND CONNECT IT TO...

Page 11: ...heck the crossover connections between cabinets Ensure that the red stripes on the ribbon cables are matched where they are connected Pressing the UP arrow located on the far right of the controller s...

Page 12: ...__________ Date Installation Completed _________________________________ Company or Person Responsible For Installation address phone number ________________________ This document confirms that the in...