VARSITY Scoreboards 3315 Installation Manual Download Page 8

8

PRODUCT SPECIFICATIONS

CONSTRUCTION

22-gauge galvanneal steel cabinet with powder coat finish for strength,

durability, and lasting appearance

INSTALLATION RECOMMENDATIONS

We recommend this model to be installed between (2) 8” steel I-beams 

(W8 x 21). 

Total length determined by local codes, customer preferred mounting 

height, and scoreboard options. Concrete Footer depth /diameter as 

well as pole/concrete specifications must be based on customer’s local 

building codes, soil conditions, and wind loads. Flat Stock mounting 

brackets and bolts are supplied.  

Support structure and mounting hardware supplied by installer/others.

OVERALL DIMENSIONS

16’ L x 5’ W x 8” D - shipped in two (2) sections 

WEIGHT

Hanging weight = approximately 490 lbs 

Shipping weight = approximately 5

55

 lbs

POWER REQUIREMENTS

SCOREBOARD

(1) 20-amp, 120-volt, 60-hertz, grounded AC circuit, disconnect switch at the scoreboard is

recommended. Specific power requirement information is also marked on the scoreboard’s serial

number label, located on the scoreboard. Power consumption is 72 watts.

LCD WIRELESS KEYBOARD CONTROLLER

(1) 12-volt adaptor in a standard 120V outlet to charge the controller

NOTE: To maintain the life of the LCD controller, in between games or seasons, store the keyboard in 

a place where you can keep the adapter plugged in year-round, helping regulate the battery voltage.

Summary of Contents for 3315

Page 1: ...MODEL 3315 Installation Manual...

Page 2: ...for the period specified in the warranty from the date of invoice SERVICE Technical Support is available 24 hours a day 7 days a week 1 800 411 3136 https www varsityscoreboards com support contact s...

Page 3: ...nstalling this scoreboard for a client please return the manual to the individual in charge of the scoreboard upon completion of installation SCOREBOARD DIMENSIONS 16 wide x 5 tall x 8 depth A NOTE TO...

Page 4: ...ALLATION OVERVIEW 7 PRODUCT SPECIFICATIONS 8 DETERMINING LOCATION AND ORIENTATION 9 INSTALLING MOUNTING POLES OR I BEAMS 10 MOUNTING THE SCOREBOARD 11 12 INSTALLING SPONSOR PANELS 13 14 TESTING INSTAL...

Page 5: ...board Shipped in two 2 sections Please inspect all shipping containers upon arrival for damage and ensure that you have all of the parts listed below ITEMS IN LARGE PACKAGE S Mounting Tools 16 mountin...

Page 6: ...hat aren t sighted for as damaged upon arrival The shipper is responsible for filing a claim unless shipped 3rd party 1 Note DAMAGED on the Delivery Receipt Form including details of the type of damag...

Page 7: ...ion applies to all Follow this guide as closely as possible to ensure proper installation 1 Review the product specifications below to determine your specific installation hardware 2 Determine the sco...

Page 8: ...mounting hardware supplied by installer others OVERALL DIMENSIONS 16 L x 5 W x 8 D shipped in two 2 sections WEIGHT Hanging weight approximately 490 lbs Shipping weight approximately 555 lbs POWER RE...

Page 9: ...d the system be used to score a daytime or afternoon game The scoreboard should be positioned so that sunlight does not glare off its face In the U S placement on the South or West side of the field i...

Page 10: ...0 of pole beam above ground an additional 21 Remember Keep boom and lines away from power lines to avoid shock or electrical burn 2 The poles I beams must be set into concrete footers Make sure the p...

Page 11: ...rd arrange the panels in order A B from RIGHT to LEFT face down with the top away from the mounting poles or I beams Keep the panels aligned at the top and against each other making sure not to pinch...

Page 12: ...l the bottom sponsor panel if included in the installation 7 Raise the scoreboard to the mounting poles or I Beams and at the proper height use a clamp at one pole or I beam to hold that corner in pla...

Page 13: ...SPONSOR PANELS NOTE DETERMINE NUMBER OF SPONSOR PANELS BEING INSTALLED AND THEIR LOCATION 6 Mounting Brackets 7 3 8 16 x 3 4 Bolts 14 M3 8 Flat Washers 7 3 8 16 Hex Nuts 18 8 x 1 2 Self Tap Screws 2...

Page 14: ...for top mounted installations or against the bottom of the scoreboard for bottom mounted installations The face of the panel should be flat against the scoreboard s front flange See Figure 1 3 Using t...

Page 15: ...e screen will display Segment Test and Segments Off Press the down arrow once to display Segments On When all segments are on all digits should display 8 4 Press the down arrow again to display Digits...

Page 16: ......

Reviews: