MODULAR SUPPORTING FRAMES
27
www.variant-factory.eu
Max. load: 2500 kg per crane-hoisting point
Leave access openings (e.g. tilt-back boards) in the
platform decking.
Use a Crane sling 3.50 m as a variable «extension».
Solution 1
Solution 2
B Crane sling 3.50 m
C Tilt-back board
In all phases of the work, ensure sufficient stability when setting down the Supporting
module units! (Where necessary, provide ballast, back-stays or extra shoring).
ATTACHING THE HOISTING TACKLE WHEN A POURING PLATFORM IS BEING USED
If it is not possible to attach the crane suspension tackle directly, e.g. because there are
platforms in the way, there are 2 possible solutions:
SHIFTING BY CRANE
The Supporting frame is equipped with 3 crane-hoisting points. In this way, it is always
possible to find an optimum centre-of-gravity position for the whole unit, despite the
many different possible configurations of the formwork and the Supporting frames (e.g.
vertically stacked configurations using attachable frames).
IMPORTANT NOTE:
- When lifting and resetting supporting modules, do not attach
the crane to the formwork element or to other components
such as walings.
- Lifting the supporting module with the formwork attached
is only permitted at near-ground level.
- Make sure that the crane suspension tackle is sufficiently
long (oblique pull).
- Never use the crane to break concrete cohesion!
(A) Crane-hoisting points
Summary of Contents for Vertex 60
Page 1: ...1 www variant factory eu ...
Page 2: ...2 VARIANT FACTORY LTD ...
Page 45: ...MODULAR SUPPORTING FRAMES 45 www variant factory eu ...
Page 46: ...46 VARIANT FACTORY LTD ...