TECHNICAL INFORMATION
51
87-900-871-01 (B)
GENERAL
Inspect the controller for any shipping damage.
Before installing the controller you must prepare some
interconnection cables, i.e. the power interconnections,
the logic interconnections and the pump connection.
In the following paragraph are detailed the above
mentioned connections.
NOTE
The PCB installed into the customer system must be
positioned so that cold air (forced or natural
convection) can flow through the PCB components.
POWER INTERCONNECTIONS
Controller to Power Connection
The power supply from the external transformer must
be connected to J10 and J8 connectors.
See the following figure for interconnections detail.
J10 and J8 Connectors Interconnection