Once all the hardware is connected, the system can be launched. Turn on the power for each of the hardware components.
The power buttons or switches are located on the front of the TIGI2U server, below, and on the back of the Protium (see
Figure 7, page 12) and GPS timing source unit (see Figure 12, page 19).
Figure 14: Intel Server Power Button
Base Station Set Up
Once the system is powered on, the base station will be functional within minutes. The BTS application will start
automatically.
Power Button