Vanguard Instruments UPS 2 Series Operating Procedures Manual Download Page 12

Operating Procedures 

UPS-S2

 

 

8

6.2 UPS-S2 AC Supply Setting 

The following steps are recommended for a typical circuit breaker operation: 
 

1. Ground the UPS-S2 to a substation safety ground. 

    2. Make sure theUPS-S2 power switch is in the off position. 
    3. Turn the Voltage Control knob to zero output. 
    4. Set the Voltage Range switch to “LOW RANGE”. 

5. Connect AC power to the UPS-S2. 
6. Connect an AC volt-meter to the UPS-S2 AC output.  
7. Select the AC voltage output on the UPS-S2. 

    8. Turn on the UPS-S2 power switch.  

9. Turn the Voltage Control Knob to set the AC voltage. 
10. Turn off the UPS-S2 power switch.  
11. Connect the AC voltage leads to the circuit breaker control circuit. 

    12. Turn on the UPS-S2 power switch. 
 
 
The UPS-S2 is now powering the circuit breaker AC control circuit. 
 
 

Summary of Contents for UPS 2 Series

Page 1: ...OPERATING PROCEDURES for the UPS S2 Universal Power Supply Series 2 Vanguard Instruments Co Inc 1520 S Hellman Ave Ontario California 91761 TEL 909 923 9390 August 2006 FAX 909 923 9391 REV 1...

Page 2: ......

Page 3: ...by trained operators Always ground the UPS S2 to a substation ground Precaution with High Test Voltage The UPS S2 can produce a voltage greater than 300Vac which can cause severe injury death and or...

Page 4: ......

Page 5: ...UPS S2 output voltage 6 5 0 UPS S2 CABLE CONNECTIONS 7 6 0 UPS S2 Operational procedures 7 6 1 UPS S2 DC Supply Setting 7 6 2 UPS S2 AC Supply Setting 8 Appendix A EZCT Troubleshooting Guide LIST OF T...

Page 6: ...Supply are 1 All output power sources are isolated from the primary power input by an isolation transformer 2 Voltage outputs are continuously variable auto transformer with a Front Panel control knob...

Page 7: ...WEIGHT 52lbs AC OUTPUT VOLTAGE 0 to 240Vac 10A max DC OUTPUT VOLTAGE 0 to 300Vdc 10A max ENVIRONMENT Operating 0 C to 55 C Storage 40 C to 65 C FURNISHED One power cord two 10 ft test lead sets One gr...

Page 8: ...tional description in Table 2 0 which describes the purpose of each item on the control panel Although the purpose of these controls and the display may seem obvious users should become familiar with...

Page 9: ...E 10A Main input power protection fuse 250 Vac 10 Ampere slow blow 4 VOLTAGE CONTROL Test voltage control knob 5 HIGH RANGE LOW RANGE Output voltage range selection 6 GROUND Ground Stud 7 8 AC OUTPUT...

Page 10: ...ion the high Range jumper is connected to terminal 6 of the variac Figure 3 Variac Terminals 4 2 UPS S2 output voltage The UPS S2 output voltage is shown in table below Table 3 UPS S2 Output Voltage w...

Page 11: ...station safety ground 2 Make sure theUPS S2 power switch is in the off position 3 Turn the Voltage Control knob to zero output 4 Set the Voltage Range switch to LOW RANGE 5 Connect AC power to the UPS...

Page 12: ...ero output 4 Set the Voltage Range switch to LOW RANGE 5 Connect AC power to the UPS S2 6 Connect an AC volt meter to the UPS S2 AC output 7 Select the AC voltage output on the UPS S2 8 Turn on the UP...

Page 13: ...ltage selection AC DC in is the wrong position 3 Variac is not set 4 Output fuse is blown 1 Check Power switch 2 Check voltage selection switch 3 Turn Variac to increase voltage 4 Check output fuse 2...

Page 14: ...10 1520 S Hellman Ave Ontario CA 91761 USA Phone 909 923 9390 Fax 909 923 9391 www vanguard instruments com UPS S2 Rev 1 08 06 HPN...

Reviews: