background image

 

 
 

 

TENT PITCHING INSTRUCTIONS 

 XENON UL2  (UK)  

Flysheet First Pitching 

1.

 

Assemble poles and lay them on the ground. 

2.

 

Open  flysheet  on  ground  and  position  in  desired  direction.  Check  internal  TBS  cords  are  un-
tensioned and  flysheet door is closed. 

3.

 

Locate pole sleeves on the flysheet and insert poles. The poles are colour coded to the pole sleeves. 

4.

 

On one side, locate the end of each pole into the corresponding eyelets on pole anchor straps. 

5.

 

On opposite side, push poles into an arch and locate pole ends into the corresponding eyelets on 

pole anchor straps. 

6.

 

Tighten the flysheet by adjusting the tension straps at the base of the poles. 

7.

 

Peg out adjustable anchor straps at the rear of the tent using pegs supplied. 

8.

 

Pull  the  tent  forwards,  away  from  pegging  points,  until  tent  takes  shape,.  Peg  the  two  anchor 
straps at the front of the tent. 

9.

 

Peg down pole anchor straps and remaining flysheet pegging points 

10.

 

Peg out ALL guy lines. 

Inner Attachment 

1.

 

Open out inner tent inside flysheet and position doorways to correspond with the living area 

2.

 

Starting  from the rear  corners  of the tent, attach the elasticated  hooks on the groundsheet to 

corresponding rings on the flysheet 

3.

 

Suspend the inner by attaching elastic of inner tent to the clips on the inside of the flysheet 

Tension Band System 

1.

 

Insert tension bands through corresponding access points in the inner tent (ceiling and sidewall). 

Connect the straps into the side-release buckles. 

2.

 

Adjust the tension of the TBS straps until the slack is taken out 

3.

 

DO NOT OVERTENSION. Excess tension will alter the shape of the tent 

4.

 

Tension band pockets are provided for storage when not in use. 

………………………………………………………………………………………………………………………………………………………

 

 

 

Reviews: