TENT PITCHING INSTRUCTIONS
–
XENON UL2 (UK)
Flysheet First Pitching
1.
Assemble poles and lay them on the ground.
2.
Open flysheet on ground and position in desired direction. Check internal TBS cords are un-
tensioned and flysheet door is closed.
3.
Locate pole sleeves on the flysheet and insert poles. The poles are colour coded to the pole sleeves.
4.
On one side, locate the end of each pole into the corresponding eyelets on pole anchor straps.
5.
On opposite side, push poles into an arch and locate pole ends into the corresponding eyelets on
pole anchor straps.
6.
Tighten the flysheet by adjusting the tension straps at the base of the poles.
7.
Peg out adjustable anchor straps at the rear of the tent using pegs supplied.
8.
Pull the tent forwards, away from pegging points, until tent takes shape,. Peg the two anchor
straps at the front of the tent.
9.
Peg down pole anchor straps and remaining flysheet pegging points
10.
Peg out ALL guy lines.
Inner Attachment
1.
Open out inner tent inside flysheet and position doorways to correspond with the living area
2.
Starting from the rear corners of the tent, attach the elasticated hooks on the groundsheet to
corresponding rings on the flysheet
3.
Suspend the inner by attaching elastic of inner tent to the clips on the inside of the flysheet
Tension Band System
1.
Insert tension bands through corresponding access points in the inner tent (ceiling and sidewall).
Connect the straps into the side-release buckles.
2.
Adjust the tension of the TBS straps until the slack is taken out
3.
DO NOT OVERTENSION. Excess tension will alter the shape of the tent
4.
Tension band pockets are provided for storage when not in use.
………………………………………………………………………………………………………………………………………………………