background image

c)

 

Mounting

 

the

 

top

 

rail

 

(alternative

 

method)

 

Place

 

the

 

top

 

rail

 

on

 

the

 

top

 

of

  

distance

 

plates,

 

with

 

the

 

sides

 

in

 

line,

 

and

 

mark

 

the

 

holes.

Remove

 

rail

 

and

 

plates

 

and

 

drill

 

holes

 

on

 

the

 

marks.

Fix

 

the

 

top

 

rail

 

position

 

of

 

distance

 

plates

 

 
 
 

 

d)

 

Click

 

the

 

cover

 

profile

 

into

 

the

 

top

 

rail

 

 

cover

 

profile

 

colored

 

black

 

 

 

 

 

Date

 

:

 

21/03/2013

Page

 

4

 

of

 

14

 

Momentum

 

HL

Momentum

0001

12

04

A

distance

 

plate

in line

Summary of Contents for Momentum

Page 1: ...wordswith level 1 components Overview 1 Attaching rails Page 2 4 2 Mount the side profiles and endstops if ordered Page 5 7 3 Placement level 0 panels Page 8 4 Placement of level 1 boards Page 9 5 Pla...

Page 2: ...dwalls is not included Hold the rail against the wall and mark the holes in the profile by using a laser beam Distance between floor and hole marks is 940mm 37 Drill the holes in the wall and fix with...

Page 3: ...all and mark the holes in the profile by using a laser beam Vertical distance between holes in the rails is 1075 42 21 64 Drill the holes in the wall and fix with hardware plugs and screws for solid w...

Page 4: ...th the sides in line and mark the holes Remove rail and plates and drill holes on the marks Fix the top rail position of distance plates d Click the cover profile into the top rail cover profile color...

Page 5: ...es If ordered slide the end stop s in the top rail necessary when combining level 2 board s with cabinet s see page slide the connectors in the rails top below Momentum HL Momentum 0001 12 04 A Date 2...

Page 6: ...e body of the connector in line with the end of the rail and fix the connector bottom view insert the end cap install the side profile HL Momentum 0001 12 04 A Date 21 03 2013 Page 6 of 14 Momentum in...

Page 7: ...place the end profile against the rails and slide it down in the connectors Fix the side profile with an allen wrench in short staps Date 21 03 2013 Page 7 of 14 Momentum HL Momentum 0001 12 04 A...

Page 8: ...anel above the gap in the lower rail and let the panel sink in it example backpanel i touchscreen 70 module 8 slide the panel to its correct position and turn the adjusters sitting in the back of the...

Page 9: ...Placement of level 1 boards and cabinets Hang the board or cabinet to the rail top below top below HL Momentum 0001 12 04 A Page 9 of 14 Momentum Date 21 03 2013...

Page 10: ...right 2 3 Top bracket left 2 4 Lower bracket 2x a Top bracket Place the top brackets in the corner of the board with the trapezium shaped nut in its open position Page 10 of 14 Momentum HL Momentum 00...

Page 11: ...se under the boardprofile and fix it by fastening the screw open position of the nut closed position of the nut nut colored black correctly placed between the board profile HL Momentum 0001 12 04 A Da...

Page 12: ...with the trapezium shaped nuts in their open position Turn the trapezium shaped nuts clockwise under the boardprofile and fix it by fasten the screws open position of the nuts closed position of the n...

Page 13: ...rail detail upper side detail lower side Fix the end stop so that there is a little space between the board and the cabinet HL Momentum 0001 12 04 A Date 21 03 2013 Page 13 of 14 Momentum top view ca...

Page 14: ...ap between wall and level o or level 1 example cut out in the top rail for wires running to a short throw beamer gable grommel allows cables to pass trough behind level 0 or level 1 boards HL Momentum...

Reviews: