www.
vancare
.com
11
Replacing the PCB
5. Position the new PCB on to the top cover of the GoLift. Make sure to line up the connector with the opening in the
cover.
6. Plug in all the harnesses.
7. Fasten the PCB to the top cover using a 3mm T-handle.