
SECTION 7: ILLUSTRATED PARTS LIST
090189-OP_r0 (JUNE-2022)
7 - 23
VANAIR MANUFACTURING, INC.
(844) VAN-SERV • www.vanair.com
Cap•Start Hydraulic-Driven
12V/24V • Battery Starter • Charger
7.11 HOSE INSTALLATION GUIDE
HOSE LAYOUT
CONSIDERATION
WRONG
RIGHT
HOSE LAYOUT
CONSIDERATION
WRONG
RIGHT
1. Hose is weakened when
installed in twisted position.
Pressure in twisted hose tends
to loosen
fi
tting connections.
Design so that machine motion
produces bending rather than
twisting.
4. Use elbows or other
adapters as necessary
to eliminate excess hose
length and to insure neater
installation for easier main-
tenance.
2. Ample bend radius should be
provided to avoid collapsing of
line and restriction of
fl
ow.
5. When hose assembly
is installed in a
fl
exing ap-
plication, remember that
metal hose
fi
ttings are not
part of the
fl
exible portion.
Allow ample free length for
fl
exing.
3. Exceeding minimum bend
radius will greatly reduce hose
assembly life.
6. When properly routing,
use clamps to secure the
hose in its proper position.
Summary of Contents for Goodall CAP-START
Page 59: ...BLANK PAGE...