IN8004 - PAGE 4 OF 7
Tighten the roof bar fixings.
3
Tighten the gutter clamp fixings.
4
5.1
A2
A1
B1
B2
(WITH
ROLLER BRACKET)
(WITH
ROLLER BRACKET)
(WITHOUT
ROLLER BRACKET)
(WITHOUT
ROLLER BRACKET)
Lift the rear side rail sections into position (A2 & B2). Ensure that the side rails are
connected to the roof bars correctly as per step 5.3.
5.2
A2
B2
TIGHTEN
TO
8Nm
TIGHTEN
TO
8Nm