Step 3: Placing the rubber tiles
Step 4: Position the ballast
Turn over the panel and place it on the rubber tile carriers.
Remove the top hinge bolts B1 and place the panel in a vertical position. Make
sure that you have some form of support in place or someone to hold the panel
temporarily.
The projections on the curved aluminium
supports must be placed in the grooves on
the rubber tiles.
Position the ballast required.
Installation manual
Valk
Box
3
C
C
C
C