background image

Step 3: Placing the rubber tiles

Step 4: Position the ballast

Turn over the panel and place it on the rubber tile carriers.

Remove the top hinge bolts B1 and place the panel in a vertical position. Make 
sure that you have some form of support in place or someone to hold the panel 
temporarily.

The projections on the curved aluminium 
supports must be placed in the grooves on 
the rubber tiles.

Position the ballast required.

Installation manual 

Valk

Box

3

C

C

C

C

Reviews: