Valor PORTRAIT 539 Installation And Owner'S Manual Download Page 8

8

ceiling

See

mantel

table

A

36” min.

to combust.

mat’l

B

Min. 39-1/2”

Center line

Edge of
protruding
arch

4-3/4”

Clearances to combustible materials in front of opening

540WDK Kit components

A

RCH

 F

RONT

 I

NSTALLATION

 

WITH

 922 

(539AFB, 539AFP, 549AFB, 549AFP)

All 

Arch fronts

 mounted to 922 fi reboxes require a 540 

WDK wire guard and mounting hardware.

Note: The bottom of the fi rebox must be installed fl ush 
with the fi nished hearth height or the cast front will not 
install properly. The cast front must rest on the hearth 
or fl oor as the fi rebox and brackets will not support it on 
their own.

ZC applications

. For ZC applications, the 922 

requires a 975ZCK—Zero Clearance Kit. Refer to the 
instructions booklet supplied with the 975ZCK.

Mantel Depth “A”

1”

2”

3”

4”

5”

6”

7”

8”

Clearance from base of heater “B”

40”

42-1/2”

Summary of Contents for PORTRAIT 539

Page 1: ...nstalled or serviced by a qualified installer service agency or gas supplier These instructions are to be used in conjunction with the main installation instructions for the above listed heater model WARNING If the information in these instructions is not followed exactly a fire or explosion may result causing property damage personal injury or loss of life PORTRAIT Cast Arch Fronts 539 549 550 Se...

Page 2: ...ing Brackets 2 Outer Cast Arch Kit Contents 539AFB P Windsor Arch 550CAP Classic Arch with plate 1 Outer cast iron arch w plate 1 Barrier screen 1 Inner cast iron arch 1 Hearth fender cast iron 2 Side mounting brackets sheet metal 4 Spacers sheet metal 1 Top baffle sheet metal 1 Top air deflector sheet metal 2 Stand off spacers sheet metal supplied flat 2 Insulation Pad 1 Pack of screws 549AFB P W...

Page 3: ...CH FRONT INSTALLATION WITH 530 539AFB 539AFP 549AFB 549AFP 550CAP Min 36 to combustible materials Dimensions Clearances 539 and 550 Arch fronts 539 Windsor Arch shown here Floor Requirements The 530 heater is approved for installation directly on any combustible material other than soft flooring material such as carpet or vinyl Mantel Requirements The Arch Fronts series is designed to install with...

Page 4: ...ing Brackets Max 8 deep mantel leg at edge of arch Min 4 Wall 9 11 1 2 2 1 2 X Mantel Top or Rear Outlet 6 556CLA Adapter Required 25 1 4 24 1 2 Y 4 1 8 11 1 2 31 34 Min 36 to combustible materials Note The 549 Windsor Arch front is intended for insert applications only and does not include the stand offs and insulation pads required for zero clearance applications Most recessed 530 insert applica...

Page 5: ...s in the side of the heater body Secure the side brackets to the heater using the screws provided 2 per side Note that the spacer brackets are to remain on for ZC application of 26 For insert application spacers can be removed for 24 openings 4 Locate Top Insulation Pad For top vent outlet appliances cut out a circle at the center of the insulation layers for the vent collar Place both the insulat...

Page 6: ...rom the backing plate Do not hit the hooks with a hammer as this may break the welds holding them Slide the hearth fender up to the front of the casting Note It is important that the hearth in front of heater be flush with the bottom of the heater otherwise the hearth fender will not rest at the proper height 7 With the 550 Arch front the hearth fender hooks into place on the inner cast arch 8 Ins...

Page 7: ...it up and pulling out the bottom then the top 2 Pull away the hearth fender at the bottom 3 Unhook the inner cast arch as shown Always securely replace the window the front and the barrier screen before lighting WARNING FOR YOUR SAFETY ensure the barrier FOR YOUR SAFETY ensure the barrier screen is reinstalled on the fireplace screen is reinstalled on the fireplace after maintenance after maintena...

Page 8: ... a 540 WDK wire guard and mounting hardware Note The bottom of the firebox must be installed flush with the finished hearth height or the cast front will not install properly The cast front must rest on the hearth or floor as the firebox and brackets will not support it on their own ZC applications For ZC applications the 922 requires a 975ZCK Zero Clearance Kit Refer to the instructions booklet s...

Page 9: ...f the shield into the corner behind the arch s cast frame as shown b Bend the canopy shield to a slight radius while inserting the other corner behind the arch s cast frame as shown it may be necessary to loosen or remove one or two of the canopy bolts c With both corners behind the arch s cast frame snap the shield forward to follow the curve of the cast iron canopy The top of the shield should f...

Page 10: ...001097AH 4001097 4001097AH 4001097 4001097AH 6 Spacers 4000976 4000976 4000976 4000976 4000976 7 Air Deflector 4000205 4000205 4000205 4000205 4001101AH 8 Top Baffle 4001098AH 4001098 4001098AH 4001098 4001098AH 9 Stand Off Spacer RH 4000209AH 4000209 n a n a 4000209AH 10 Stand Off Spacer LH 4000210AH 4000210 n a n a 4000210AH 11 Insulation Blanket 2 4000206 4000206 n a n a 4000206 12 Barrier Scre...

Page 11: ...ate 4000487 REPAIRS PARTS LIST 540WDK Designed and Manufactured by for Miles Industries Ltd 190 2255 Dollarton Highway North Vancouver B C CANADA V7H 3B1 Tel 604 984 3496 Fax 604 984 0246 www valorfireplaces com Because our policy is one of constant development and improvement details may vary slightly from those given in this publication ...

Reviews: