
26
26
Installation Planning
Fan (Blower)
Allow for and install electrical wiring if there will be a fan
(blower) to install. Ask the homeowner if you are not
sure.
Venting Con
fi
guration
This unit is supplied with a
top outlet
and is
fi
eld
convertible to a
rear outlet
. Plan routing of vent taking
Roof
Pitch
Minimum
"H" (feet)
Flat to 7/12
1'
Over 7/12 to
8/12
1.5'
Over 8/12 to
9/12
2’
Over 9/12 to
10/12
2.5’
Over 10/12 to
11/12
3.25’
Over 11/12 to
12/12
4’
Over 12/12 to
14/12
5’
Venting
Unpack Appliance
The Madrona engine is supplied separately from the
stove casings. The Traditional stove—MFCS01 (black)
or MFCS02 (majolica brown)—and the Contemporary
stove MFCS04 are each supplied in two cartons. You
must have in hand the stove casing before starting the
assembly of the appliance.
Unpack the carton carefully.
We strongly recommend
that you leave the engine sitting on the packaging
base in which it came to avoid damaging the
control valve, wires and pipes already attached
to the engine until it is ready to insert in the stove
casing.
CAUTION
LEAVE THE ENGINE ON ITS PACKAGING
BASE to avoid damage to the control valve,
wires and pipes until ready to insert into
stove casing.
Vertical Vent Termination
into consideration stove and vent clearances, allowable
vent terminal locations
BEFORE
cutting a hole in the
roof or wall. Avoid penetrating the wall/roof at structural
members.
Gas Line Routing
Consider visibility of shut-off valve or step-down
regulators, etc. when planning gas line routing.
Some parts are packed in the cardboard sleeve around
the engine; make sure you take them all out of the
packaging. Make sure you have all the components
including the stove casing components before you start
the installation.
Only quali
fi
ed licensed or trained personnel
should install this appliance.
Installation
QUALIFIED
INSTALLER