Valor 1430CIK Installation Manual Download Page 5

5

5.  Install the top panel as indicated (4 x 1/2" screws).

6.  Ensure the appliance is snug against the framing 

and secure it to the studs on each side (4 

fi

 xing 

points per side). Use wood screws (not supplied with 

this kit).

7.  Set aside the side doors, removable panel and bar-

rier screen to install later when the appliance’s set-

up and wall 

fi

 nish application are completed. 

8.  Continue the installation of the appliance.

Finish kit installation

Once the appliance installation and wall 

fi

 nish is 

completed, 

fi

 nish the installation of the kit.

1.  Slide the removable panel at the bottom of the 

fi

 replace into the clips on the horizontal supports on 

each side; the panel covers the valve and goes 

under the 

fi

 rebox. Push the panel in until fully 

inserted into the clips. 

2.  Identify the left hand door from the right using 

diagram below.

Left Side Door

Right Side Door

Tab at the bottom

Summary of Contents for 1430CIK

Page 1: ...ing around this kit This kit is not intended to and cannot be installed with any other trim Overview H6 1400M Top panel Left hand panel Right hand panel Lower panel Right hand door Left hand door Remo...

Page 2: ...ULDO 1 2 combustible shims at ends to match Micore 1 2 insulating Micore panel min 30 wide x 10 deep supplied with appliance 1 5 8 42 mm max thickness including Micore RZHU SDQHO Lower panel Removable...

Page 3: ...ed within 4 vertically below the bottom of the appliance will need to be constructed of non combustible material and must include the 1 2 Micore insulation board provided to be used as a thermal break...

Page 4: ...ng strip installed Finishing strip ONLY with HeatShift Remove the 4 screws retain ing the removable convection ba e Remove the ba e then slide the finishing strip over the screw holes and secure it to...

Page 5: ...nish application are completed 8 Continue the installation of the appliance Finish kit installation Once the appliance installation and wall finish is completed finish the installation of the kit 1 Sl...

Page 6: ...Vancouver B C CANADA V7H 3B1 Tel 604 984 3496 Fax 604 984 0246 3 Position LH door to left side of front frame identify top and bottom door slots just behind front panel and slide door locator laterall...

Page 7: ...JAMAIS UN ENFANT TOUCHER LA VITRE L cran pare tincelles fourni avec ce foyer r duit le risque de br lure en cas de contact accidentel avec la vitre chaude et doit tre install pour la protection des en...

Page 8: ...des et peuvent causer des br lures aux enfants et personnes risques Coupe transversale au mur d tail Finition au mur Finition avec dalle Coupe transversale dalle d tail Panneau du bas Panneau amovible...

Page 9: ...s la base de l appareil devra tre fabriqu e de mat riaux incombustibles Elle devra inclure le panneau isolant Micore de 1 2 13 mm fourni titre d isolant thermique entre le mat riau incombustible de la...

Page 10: ...on Bande de finition install e Bande de finition SEULEMENT avec HeatShift Enlevez les 4 vis retenant le d flecteur de convection amovible Enlevez le d flecteur puis ins rez la bande de finition sur le...

Page 11: ...finition du mur compl t es 8 Continuez l installation du foyer Compl tez l installation du 1430CIK Une fois l installation des pi ces internes termin e et la finition du mur appliqu e compl tez l inst...

Page 12: ...984 0246 3 Installez la porte gauche en ins rant ses onglets lat ralement dans les fentes situ es juste derri re la fa ade du montant de la bordure tel qu indiqu Poussez la porte vers le bas pour la s...

Reviews: