Installation manual 

 

 
 

 

Base frame 

(Foundation joists) 

The base frame of the house must be completely flat and level to ensure that the installation proceeds 
without problems. 

ATTENTION: different house can have different foundation placements – see the appended 
base frame drawing (in Technical specifications)! 

Place the impregnated foundation joists on the prepared foundation in accordance with the drawing at 
equal intervals. Make sure that the joists are level and rectangular prior to screwing them together.  

ADVICE

: It is recommended to place between the foundation joists and foundation a damp-proof 

course that will protect the house from moisture and decay.  

ADVICE

: To ensure protection from wind and storm, it is recommended to attach the foundation joists 

to the foundation (for this, you can use for instance metal angles, anchors, etc.). The corresponding 
materials are not included in the supplied kit! 

Installation of foundation joists: 

 

 

Walls 

When installing the walls, it is important to remember that: 

  The logs are always assembled with their tongue upwards! 

  If necessary, use the hitting block and hammer! Never directly hit the tongue with the hammer! 

Install the walls in accordance with the appended wall plans (see Technical specifications). 

First of all place half logs of front and back wall at the 
correct location and attach them with screws to the 
foundation joists. Then install the side wall logs. Make sure 
that the first layer of logs extends a bit over the foundation 
joists: the logs must extend over the joists by some 3-5 mm. 
You will thus protect the house from moisture, allowing the 
free flow of rainwater into the ground.  

 

ATTENTION

After the first layer of logs, measure the 

diagonal lengths and, if necessary, re-install the logs. Only if 
the diagonal lengths are completely equal is the base frame 
rectangular and you can mutually attach the logs.  

        

 

            The first layer of logs: 

 

Summary of Contents for OREGON 2

Page 1: ...al prodotto Reservado el derecho a modificaciones t cnicas Produsent forbeholder seg retten til endre tekniske egenskaper ved produktet Alle rechten en technische wijzigingen voorbehouden V robce si...

Page 2: ...f the house We can only review complaints if you submit the control number of the house to the seller The warranty does not cover Peculiarities of wood as a natural material Wooden details already pai...

Page 3: ...windows with a wood impregnation agent and do that namely both inside and outside Otherwise the doors and windows can become twisted After the house assembly is completed we recommend for the conclusi...

Page 4: ...At the same time make sure that there are sufficient air apertures under the house floor for ventilation We recommend the following foundation options Strip or spot foundation Foundation from concrete...

Page 5: ...rresponding materials are not included in the supplied kit Installation of foundation joists Walls When installing the walls it is important to remember that The logs are always assembled with their t...

Page 6: ...eaves on the hinges now To open and close the door fit the separately packaged lock and handle Window installation Continue with the installation of the wall logs until you reach the window height The...

Page 7: ...r plane the apex or sidewall log somewhat lower Roof Before installing the roof boards make sure that the house is completely level Use the water level to check all walls ATTENTION When placing the ro...

Page 8: ...with the supplied felt nails at intervals of about 15 cm Make sure that the felt strips overlap by at least 10 cm Having installed the roof cover material attach the wind braces to the roof and the fa...

Page 9: ...ry shorten the upper ends of the slats Do not turn the screws tightly so wood can further swell or diminish With the house having settled you should adjust the attachments so the wall logs can settle...

Page 10: ......

Page 11: ......

Page 12: ...BOX...

Page 13: ......

Page 14: ...AS Palmako N ituse 25 Tartu 50409 Estonia tel 372 73 55 530 fax 372 73 55 544 www palmako com...

Page 15: ...AS Palmako N ituse 25 Tartu 50409 Estonia tel 372 73 55 530 fax 372 73 55 544 www palmako com...

Page 16: ...AS Palmako N ituse 25 Tartu 50409 Estonia tel 372 73 55 530 fax 372 73 55 544 www palmako com...

Page 17: ...AS Palmako N ituse 25 Tartu 50409 Estonia tel 372 73 55 530 fax 372 73 55 544 www palmako com...

Page 18: ...AS Palmako N ituse 25 Tartu 50409 Estonia tel 372 73 55 530 fax 372 73 55 544 www palmako com...

Page 19: ...18 5 AS Palmako N ituse 25 Tartu 50409 Estonia tel 372 73 55 530 fax 372 73 55 544 www palmako com...

Page 20: ...AS Palmako N ituse 25 Tartu 50409 Estonia tel 372 73 55 530 fax 372 73 55 544 www palmako com...

Page 21: ...AS Palmako N ituse 25 Tartu 50409 Estonia tel 372 73 55 530 fax 372 73 55 544 www palmako com...

Page 22: ......

Reviews: