background image

Installation manual 

Preparation of components: 

Sort the components based on the 
wall plans (see Technical 
specifications) and place them at 
the four sides of the house in the 
installation sequence. 

ATTENTION:

 Never place the 

components directly on grass or a 
muddy surface because it will be 
very difficult or even impossible to 
clean them up later! 

Foundation 

A good foundation is the most important aspect guaranteeing the duration and safety of your house. 
Only a completely level, rectangular and bearing foundation will ensure problem-free installation of the 
house, its stability and especially the matching of the doors. With a good foundation, your house will 
stand for many years more.  

Prepare the foundation so that its upper edge extends from the ground to a height of at least 5 cm. At 
the same time make sure that there are sufficient air apertures under the house floor for ventilation.  

We recommend the following foundation options: 

Strip or spot foundation

Foundation from concrete or pavement slabs

Cast concrete bed

Prepare the foundation so that the foundation joists are propped up on every side with intervals not 
exceeding 50-60 cm. 

Consult an expert in this field or have the foundation prepared by specialists. 

3 Garden house assembly 

ATTENTION

:  

You will find included in the house package one spare log (longest wall log).

You will find included in the house package one spare board (longest roof or floor board).

The house package also includes 2-3 marked hitting blocks (wall profile approximately 20-30 cm
long).

All of the details listed above ARE NOT mentioned in the specification list. 

The drawings have the details marked with three-digit position numbers. The exact positions of
those details that have the third digit “x” can be found in the specification list.

Summary of Contents for HONOLULU 2

Page 1: ...ons techniques au produit Il produttore mantiene il diritto di apportare modifiche tecniche al prodotto Reservado el derecho a modificaciones t cnicas Produsent forbeholder seg retten til endre teknis...

Page 2: ...f the house We can only review complaints if you submit the control number of the house to the seller The warranty does not cover Peculiarities of wood as a natural material Wooden details already pai...

Page 3: ...windows with a wood impregnation agent and do that namely both inside and outside Otherwise the doors and windows can become twisted After the house assembly is completed we recommend for the conclusi...

Page 4: ...At the same time make sure that there are sufficient air apertures under the house floor for ventilation We recommend the following foundation options Strip or spot foundation Foundation from concrete...

Page 5: ...rresponding materials are not included in the supplied kit Installation of foundation joists Walls When installing the walls it is important to remember that The logs are always assembled with their t...

Page 6: ...eaves on the hinges now To open and close the door fit the separately packaged lock and handle Window installation Continue with the installation of the wall logs until you reach the window height The...

Page 7: ...r plane the apex or sidewall log somewhat lower Roof Before installing the roof boards make sure that the house is completely level Use the water level to check all walls ATTENTION When placing the ro...

Page 8: ...with the supplied felt nails at intervals of about 15 cm Make sure that the felt strips overlap by at least 10 cm Having installed the roof cover material attach the wind braces to the roof and the fa...

Page 9: ...ry shorten the upper ends of the slats Do not turn the screws tightly so wood can further swell or diminish With the house having settled you should adjust the attachments so the wall logs can settle...

Page 10: ......

Page 11: ......

Page 12: ......

Page 13: ......

Page 14: ......

Page 15: ......

Page 16: ......

Page 17: ......

Page 18: ......

Page 19: ...LAZFB19 3232 4 LAZFB19 2632 For model with floor and foundation...

Page 20: ......

Page 21: ......

Page 22: ...4 5x70 4 5x70 3 10 D D E E 1 2 1 E2 A A B B C C LAZFB19 3232 4 LAZFB19 2632 AR1 AR1 20x20x40 AR1 For model with floor and foundation SP1 CoB1 CoB1 RB1 002 001 002 BM2 Pst3 Pst4 4 5x50 22pcs M8x80 6pcs...

Page 23: ......

Reviews: