Installation and maintenance manual ecoMAX 665 / 0020020159_03
No.
Step
To be carried out during:
Inspection
Maintenance
1
Disconnect the appliance from the mains supply, close the gas supply and maintenance cocks,
depressurize the appliance on the water side (observe the pressure gauge)
X
2
Dismantle thermal compact module
X
3
Clean the integral condensation heat exchanger
X
4
Check whether the burner is dirty
X
5
Install compact thermal module.
Caution: replace the seals!
X
6
Check whether the electrical plug connections and other connections are fitted tightly
and make adjustments, if necessary.
X
X
7
Cleaning the air intake tube
X
8
Open the maintenance cocks and fill the appliance/system up to about 1.0 - 2.0 bar
(depending on the static height of the system); start the venting program
X
9
Check the overall condition of the appliance, remove general dirt from the appliance
and the vacuum chamber
X
X
10
Check the condensate siphon in the appliance, and clean and fill it if necessary.
X
X
11
Clean the condensate paths in the appliance
X
12
Open the gas supply and switch on the appliance
X
X
13
Perform a test run on the appliance and heating system, including
water heating, and bleed if necessary
X
X
14
Test ignition and burner performance
X
X
15
Check whether the appliance is leaking flue gas, water or condensate
X
X
16
Check the flue system for leaks and that it is fixed properly, and make adjustments if necessary
X
X
17
Check appliance gas setting, reset and record if necessary.
X
18
Complete the gas commissioning checklist (Benchmark)
X
X
Table 7.1: Maintenance steps